Browse
Search
8.21.23 OUTBoard Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2023
>
8.21.23 OUTBoard Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 4:44:52 PM
Creation date
8/11/2023 4:38:13 PM
Metadata
Fields
Template:
BOCC
Date
8/21/2023
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEAM EXPERIENCE Orange County Transportation Multimodal Plan <br /> RACHEL GAYLORD-MILES, AICP I TRANSIT DOMAIN EXPERT <br /> FIRM EDUCATION 0 LOCATION <br /> h NC <br /> WSP USA B.S.,Geography Raleigh, <br /> YEARS EXPERIENCE U AVAILABILITY <br /> EM 8 Years O J� 40%/50%(present/projected) <br /> PROFESSIONAL REGISTRATION <br /> Certified Planner,American Planning <br /> Association <br /> Summary of Qualifications Relevant Experience <br /> Rachel is a transit planner focusing on multi-modal ►NW Harnett County Transit Feasibility Study,Harnett <br /> transportation,transit,and rail projects with years of County,NC;Transit Lead <br /> stakeholder and community engagement experience. ►Wake BRT,Western Boulevard Corridor Study,Raleigh, <br /> She is serving as Deputy Project Manager for one of NC;Lead Planner <br /> the first four Wake Transit BRT lines in Raleigh,North o.Downtown Cary Multi-Modal Transit Facility Feasibility <br /> Carolina.Rachel has served as lead planner on a variety Study,Cary,NC;Planner <br /> of projects including transit alternatives analysis studies, .GoDurham Transit Planning and Operational Analysis; <br /> corridor studies,and long-range planning efforts. She <br /> has extensive experience leading day-to-day project Durham,NC;Task Lead <br /> operations,including coordination with various technical ►North Carolina Transit Cares,NCDOT;Lead Planner <br /> staff. ►First Mile/Last Mile Connectivity Study,Research <br /> Current Assignments Triangle Park,NC;Transportation Planner <br /> NW Harnett County Transit Feasibility Study(Completes in <br /> 2025) <br /> NATHAN ELLIS, PE I RAIL DOMAIN EXPERT <br /> fffl FIRM EDUCATION Q LOCATION <br /> V Raleigh,NC <br /> �- WSP USA BS,Civil Engineering,North Carolina <br /> State University <br /> YEARS EXPERIENCE Q AVAILABILITY <br /> 4& ® 13 Years O�� <br /> 25%/30%(present/projected) <br /> OPROFESSIONAL REGISTRATION <br /> +� Professional Engineer:NC(042018) <br /> Summary of Qualifications Relevant Experience <br /> Nathan currently serves as the Vice President and ►Wilmington Rail Realignment,Wilmington,NC;Lead Rail <br /> leader for the Freight Railroad/Transit Engineering Design Engineer and Railroad Coordinator <br /> and Construction group in the WSP Raleigh Office. He ►Improvements to Berths 4&5 at the Port of Morehead <br /> has thirteen years of professional experience working City,Morehead City,NC;Lead Rail Design Engineer <br /> extensively with multiple stakeholders on various railroad .U-4437 Blue Ridge Road Grade Separation,Raleigh,NC; <br /> engineering designs using OpenRail,InRoads,and Geopak Rail CEI Coordination Consultant <br /> software,railroad planning,railroad coordination, <br /> railroad project management,and railroad construction ►Amtrak Northeast,New Haven,CT to Boston,MA;Rail <br /> projects in the southeast United States. Design Engineer <br /> Current Assignments <br /> Richmond Layover Facility Preliminary Engineering <br /> (Completes in 2024),Long Bridge Program Management <br /> Support Services(Completes in 2030),Downtown <br /> Wilmington Trail(Completes in 2024) <br />
The URL can be used to link to this page
Your browser does not support the video tag.