Browse
Search
8.21.23 OUTBoard Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2023
>
8.21.23 OUTBoard Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 4:44:52 PM
Creation date
8/11/2023 4:38:13 PM
Metadata
Fields
Template:
BOCC
Date
8/21/2023
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEAM EXPERIENCE Orange County Transportation Multimodal Plan <br /> MARIA ESCUERRA LIMITED ENGLISH PROFICIENCY ENGAGEMENT <br /> FIRM To EDUCATION Q LOCATION <br /> 7 WSP USA BA,Public Health,University of Charlotte,NC <br /> South Carolina <br /> YEARS EXPERIENCE AVAILABILITY <br /> 2 Years 35%/40%(present/projected) <br /> Summary of Qualifications Relevant Experience <br /> Maria has experience engaging the public on various ►U.S.401 Corridor Study,Wake and Harnett Counties,NC; <br /> outreach campaigns. She has built strong relationships Community Engagement <br /> with media sources,community organizations,local P. Charlotte Area Transit(CATS)LYNX Silver Line, <br /> leaders,and state legislators.Maria has supported Charlotte,NC;Community Engagement <br /> community outreach across a variety of sectors,from ►I-77/Jane Sowers Interchange Feasibility Study, <br /> public health to transportation and energy.She's Statesville,NC;Community Engagement <br /> able to focus engagement efforts to Spanish speaking <br /> communities. <br /> Current Assignments <br /> Baton Rouge Capital Area Transit System AoPP Study <br /> (Completes in 2024),Vermont Agency of Transportation- <br /> West Fairlee Culvert Replacement(Completes in 2023) <br /> LEAH WEAVER I ROADWAY DOMAIN EXPERT <br /> OB FIRM TorEDUCATION LOCATION <br /> IN WSP USA BS,Civil Engineering Raleigh,NC <br /> r u!a YEARS EXPERIENCE AVAILABILITY <br /> ® 7 Years 40%/50%(present/projected) <br /> Summary of Qualifications Current Assignments <br /> Leah is a senior transportation planner with experience Clayton Comprehensive Transportation Plan,Express <br /> as a planner and transportation engineer in both the Design Feasibility Studies,Division 13 Bridge Planning <br /> public and private sectors including employment with Documents(All projectes complete in 2024) <br /> NCDOT prior to joining WSP. She has proficiency working Relevant Experience <br /> with state and local transportation agencies,municipal ►US 401 Corridor Study,Wake and Harnett Counties; <br /> governing bodies,and private stakeholders to provide Transportation Planner <br /> planning and engineering services. She has spent most ►Town of Clayton Comprehensive Transportation Plan, <br /> of her career working on a variety of roadway design y p p <br /> projects for NCDOT at the planning and final design Clayton,NC;Deputy Project Manager <br /> stages.She also has experience with public involvement ►NCDOT Feasibility Studies,North Carolina;Task Lead <br /> including public meetings and smaller focus group P. US 1 Safety Improvements,West Columbia,SC;Lead <br /> meetings with neighborhoods,businesses,and community Transportation Designer <br /> leaders. <br />
The URL can be used to link to this page
Your browser does not support the video tag.