Browse
Search
8.21.23 OUTBoard Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2023
>
8.21.23 OUTBoard Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 4:44:52 PM
Creation date
8/11/2023 4:38:13 PM
Metadata
Fields
Template:
BOCC
Date
8/21/2023
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEAM EXPERIENCE Orange County Transportation Multimodal Plan <br /> SRAVYA SURYADEVARA, PE I PROJECT PRIORITIZATION LEAD <br /> MFIRM 1 V EDUCATION LOCATION <br /> WSP USA MS,Civil Engineering,North Raleigh,NC <br /> Carolina State University <br /> YEARS EXPERIENCE <br /> 15 Years AVAILABILITY <br /> PROFESSIONAL REGISTRATION <br /> 00 40%/50%(present/projected) <br /> Professional Engineer:NC(037505) <br /> Summary of Qualifications Relevant Experience <br /> Sravya is WSP's North Carolina Traffic Lead located in ►Wake BRT,City of Raleigh,NC:Lead Traffic Engineer <br /> the firm's Raleigh office.With 15 years of experience, P. CATS Lynx Silver Line,Charlotte,NC;Lead Traffic <br /> she has developed the skills to lead projects in the field Engineer <br /> of transportation engineering. She provides technical P. US 401 Corridor Study,Wake and Harnett Counties;Lead <br /> expertise in transportation planning,traffic forecasting, Traffic Engineer <br /> capacity analysis,roadway functional designs,and <br /> modeling of transportation systems. Sravya has also <br /> participated in several in development of public <br /> involvement plans and attended several public meetings. <br /> Current Assignments <br /> Clayton Comprehensive Transportation Plan(Completes <br /> in 2024),Wake Bus Rapid Transit(Completes in 2024),CATS <br /> Lynx Silver Line(Completes in 2026) <br /> ABRAHAM CHAMPAGNE, AICP I MULTIMODAL TRANSPORTATION <br /> ANALYSIS AND PLANNING SUPPORT <br /> FIRM EDUCATION LOCATION <br /> i <br /> WSP USA Master of Resilient Urban Design, Charleston,SC <br /> Clemson University <br /> w <br /> �+ YEARS EXPERIENCE MA,Education,College of Charleston <br /> ® 14 Years BS,Human Services,Springfield <br /> College <br /> 'r t PROFESSIONAL REGISTRATION AVAILABILITY <br /> #* Certified Planner,American Planning W 40%/50%(present/projected) <br /> Association <br /> Summary of Qualifications Relevant Experience <br /> Abraham is an Urban Planner with WSP.He has P. US 401 Corridor Study,Wake and Harnett Counties; <br /> experience working in local government ushering large Transportation Planner <br /> mixed-use developments through the land entitlement P.Town of Clayton Comprehensive Transportation Plan, <br /> process and providing strategies and support for public Clayton,NC;Deputy Project Manager <br /> outreach related to comprehensive plan updates. ►NCDOT Feasibility Studies,North Carolina;Task Lead <br /> He has also been involved in various transportation P. US 1 Safety Improvements,West Columbia,SC;Lead <br /> improvements,transit-oriented development master <br /> plans and street redesign.He has skills in cartography, Transportation Designer <br /> infographics and has served on commissions related to <br /> housing and mobility. <br /> Current Assignments <br /> US 29 Corridor Study(Completes in 2025),Joe Frazier Road <br /> Corridor Study(Completes in 2024),NFTA Buffalo Transit- <br /> Oriented Development Planning(Completes in 2023) <br />
The URL can be used to link to this page
Your browser does not support the video tag.