Browse
Search
8.21.23 OUTBoard Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2023
>
8.21.23 OUTBoard Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 4:44:52 PM
Creation date
8/11/2023 4:38:13 PM
Metadata
Fields
Template:
BOCC
Date
8/21/2023
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEAM EXPERIENCE Orange County Transportation Multimodal Plan <br /> TEAM RESUMES <br /> SHIVANC SHELAT,AICP I PROJECT MANAGER <br /> M FIRM lW EDUCATION Q LOCATION <br /> Im WSP USA M.C.R.P.,Transportation Raleigh,NC <br /> Planning,Rutgers University <br /> YEARS EXPERIENCE <br /> EM <br /> 9 Years Q AVAILABILITY <br /> 50%/50%(present/projected) <br /> O PROFESSIONAL REGISTRATION <br /> *VL Certified Planner:AICP <br /> Summary of Qualifications Relevant Experience <br /> Shivang is a transportation planner and systems analyst ►Orange County Transit Dashboard,Orange County,NC; <br /> specializing in corridor studies,transportation plans,and Project Manager <br /> travel demand and transit ridership modeling.Shivang has held ►Town of Clayton Comprehensive Transportation Plan, <br /> Project Manager and Deputy Project Manager roles on numerous Clayton,NC;Project Manager <br /> projects across the Triangle region,including several with the P.Town of Wake Forest Comprehensive Transportation <br /> Durham-Chapel Hill-Carrboro(DCHC)MPO.Shivang is currently Plan,Wake Forest,NC;Deputy Project Manager and Lead <br /> managing the ongoing Orange County Transit Dashboard where Planner <br /> he has successfully been integrating data provided by Orange P. CAMPO Transit Performance Measures Dashboard, <br /> County and working with the WSP graphics team to develop Raleigh,NC;Project Manager <br /> the interactive dashboard.His strength is the ability to combine P. US 401 Corridor Study,Wake and Harnett Counties,NC; <br /> analytical and technical competence with a big picture approach Deputy Project Manager <br /> to problem solving. <br /> Current Assignments <br /> Orange County Transit Dashboard(Completes in 2023), <br /> Clayton Comprehensive Transportation Plan,Nashville <br /> Housing Dashboard(Completes in 2024),San Antonio VIA <br /> BRT Stops Modeling,UDOT Frontrunner CIG(Completes in <br /> 2023),NW Harnett Co Transit Study(Completes in 2025) <br /> CLAIRE BRINKLEY, PE,AICP I QUALITY ASSURANCE/CONTROL <br /> M FIRM 1 o EDUCATION Q LOCATION <br /> Im WSP USA BS,Civil Engineering,North Carolina Charlotte,NC <br /> gal& YEARS EXPERIENCE State University <br /> ® 18 Years � AVAILABILITY <br /> OPROFESSIONAL REGISTRATION D 20%/30%(present/projected) <br /> Professional Engineer:NC,SC; <br /> Certified Planner,American Planning Association(NC-APA) <br /> Summary of Qualifications Relevant Experience <br /> Claire Brinkley is a Transportation Planner/ P. Microtransit Feasibility Study,Piedmont,NC:Project <br /> Engineer with eighteen years of experience providing Manager <br /> transportation planning services to clients. Claire has P. Goldsboro-Wayne Transportation Authority <br /> contributed to a wide range of planning efforts including Comprehensive Transit Service Plan:Project Manager <br /> alternatives analyses,short-range service plans,long- ►Chatham Transit Network Study,Chatham County: <br /> range vision plans,and feasibility studies. She often Project Manager <br /> facilitates public involvement and communications efforts P. South Corridor Study,Nashville,TN:Project Manager <br /> to engage the community in the planning process. P. CATS LYNX System Update,Charlotte,NC:Deputy Project <br /> Current Assignments Manager <br /> Wytheville Transit Stop Feasibility Study,CATS South <br /> Park Stop Facility Assessment(Completes in 2023) <br />
The URL can be used to link to this page
Your browser does not support the video tag.