Orange County NC Website
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br /> TIP/WBS # Description LET/Start Draft STIP Completion Cost Status Project Lead <br /> Date Let Date Date <br /> 1-5967 Interchange improvements at 1-85 and SR 1009 (South 10/19/2027 FY2031 FY2030 $16,900,000 PE funding approved 9/8/17, Planning and Bryan Key <br /> 45917.1 .1 Churton Street) in Hillsborough Design activities underway, Coordinate <br /> 45917.2.1 with 1-0305 and U-5845 <br /> 45917.3.1 <br /> 1-5959 Pavement Rehabilitation on 1-85 from West of SR 1006 11/16/2027 N/A FY2029 $11 ,156,000 Planning and design activities pending Chad Reimakoski <br /> BR-0247 Replace Bridge #29 on US 70 Business/NC 86 over Cates 11/16/2027 N/A FY2029 Pending Preliminary activities pending Vacant <br /> Creek <br /> R-5821A Construct operational improvements including 6/20/2028 Funded for FY2031 $7,000,000 PE funding approved 10/10/17, design Chris Smitherman <br /> 47093.1 .2 Bicycle/Pedestrian accommodations on NC 54 from SR Preliminary activities currently suspended, <br /> 47093.2.2 1006 (Orange Grove Road) to SR 1107 /SR 1937 (Old Engineering Coordinating with NC54 West Corridor <br /> 47093.3.2 Fayetteville Road). Only Study <br /> U-5845 Widen SR 1009 (South Churton Street) to multi-lanes from 1- 7/18/2028 FY2031 FY2031 $49,238,000 PE funding approved 5/14/15, Planning Radha Attaluri <br /> 50235.1 .1 40 to Eno River in Hillsborough and Design activities underway, <br /> 50235.2.1 Coordinate with 1-5967 <br /> 50235.3.1 <br /> BP7-R007 Replace Bridge #63 on Pleasant Green Road 8/3/2028 N/A FY2031 $2,500,000 Planning and design activities underway Vacant <br /> BP7-R015 Replace Bridge #86 on SR 1942 (Jones Ferry Road) 8/18/2028 N/A FY2030 $1 ,700,000 Planning and design activities underway Vacant <br /> BR-0091 Replace Bridge #32 on US 70 over the Eno River 10/17/28 N/A FY2032 $4,000,000 Planning and design activities underway Jon Gaillard <br /> 11/19/24 FY2028 <br /> 1-5984 Interchange improvements at 1-85 and NC 86 in 11/21/2028 Funded for FY2031 $20,900,000 PE funding approved 10/10/17, Planning Bryan Key <br /> 47530.1 .1 Hillsborough Preliminary and Design activities underway, <br /> 47530.2.1 Engineering Coordinate with 1-0305 and 1-5959 <br /> 47530.3.1 Only <br /> B-5733 Replace Bridge #39 over Booker Creek in Chapel Hill on SR 1/16/2029 N/A FY2031 $5,100,000 Planning and design activities pending Jennifer Hernandez <br /> 1010 (E. Franklin St.) <br /> DCHCMPO Apr. 2023 <br /> Page 3 <br />