Browse
Search
6.26.23 OUTBoard Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2023
>
6.26.23 OUTBoard Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 4:45:59 PM
Creation date
8/11/2023 4:36:18 PM
Metadata
Fields
Template:
BOCC
Date
6/26/2023
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br /> TIP/WBS # Description LET/Start Draft STIP Completion Cost Status Project Lead <br /> Date Let Date Date <br /> C-5650 Construct sidewalk on one side of SR 1919 (Smith Level 3/29/2024 FY2024 FY2026 $1 ,718,000 Planning and design activities underway Town of <br /> Road/S. Greensboro St.) from Public Works Drive to the Carrboro/Stephen <br /> northern end of Old Pittsboro Road in Carrboro Robinson <br /> B-6037 Replace Bridge #49 over Norfolk Southern Railway on NC 1/21/2025 FY2025 FY2028 $2,500,000 Planning and design activities underway Brian Ketner <br /> 86 <br /> BR-0092 Replace Bridge #37 on NC 86 over New Hope Creek 8/19/2025 N/A FY2028 $4,100,000 Planning and design activities underway Alexander Foster <br /> EB-5880 Construct sidewalk on the north side of SR 1005 (Jones 9/30/2025 FY2025 FY2027 $441 ,000 Planning and design activities underway Town of <br /> EB-5890 Construct sidewalk on Barnes Street from King Street to SR 9/30/2025 FY2025 FY2027 $230,000 Planning and design activities pending Town of <br /> 1005 (Jones Ferry Road) in Carrboro Carrboro/Stephen <br /> Robinson <br /> EB-5886B Construct sidewalk/MUP/bike lanes on Estes Drive from 10/2/25 FY2025 FY2027 $3,104,000 Planning and design activities pending Town of Chapel <br /> south of Norfolk Southern Railroad to NC 86 (MLK Jr. Blvd.) 9/18/25 Hill/Stephen Robinson <br /> in Chapel Hill <br /> 1-3306AC 1-40 at NC 86 - Upgrade to superstreet from Northwood 10/21/2025 FY2026 FY2028 $4,350,000 Planning and design activities underway Radha Attaluri <br /> Drive to Ramp C/D at 1-40 interchange <br /> BP7-R009 Replace Bridge #11 on SR 1336 (Halls Mill Road) 11/6/2025 N/A FY2028 $1 ,100,000 Planning and design activities underway Vacant <br /> BP7-R013 Replace Bridge #90 on SR 1940 (Damascus Church Road) 9/3/2026 N/A FY2029 $800,000 Planning and design activities underway Vacant <br /> EB-5998 Construct MUP on US 15/501 from Willow Drive to SR 9/30/2026 FY2026 FY2028 $2,044,000 Planning and design activities pending Town of Chapel <br /> EB-5886A Construct sidewalk/MUP/bike lanes on Estes Drive from SR 9/17/2026 FY2026 FY2029 $848,000 Planning and design activities pending Town of <br /> 1772 (North Greensboro Street) to south of Norfolk Southern Carrboro/Stephen <br /> Railroad Tracks in the Town of Carrboro Robinson <br /> 1-5958 Pavement Rehabilitation on 1-40/1-85 from West of SR 1114 11/17/2026 FY2027 FY2028 $8,690,000 Planning and design activities pending Chad Reimakoski <br /> 45910.1 .1 (Buckhorn Road) to West of SR 1006 (Orange Grove Road) <br /> 45910.3.1 <br /> DCHCMPO Apr. 2023 <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.