Orange County NC Website
5/5/2023 <br /> North Carolina Department of Transportation <br /> Active Projects Under Construction - Alamance Co. <br /> Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion <br /> Number Number Engineer Amount Date Date Date Completion Schedule Percent <br /> Date Percent <br /> C203844 U-3109A NC-119 RELOCATION FROM 1-40/85 TO SR-1921 THALLE CONSTRUCTION Howell, Bobby J $45,389,069.36 6/26/2017 1/28/2021 8/3/2017 2/28/2023 100.00 99.31 <br /> (MEBANE ROGERS RD/ STAGE COACH RD). CO., INC. <br /> C204438 B-5728 REPLACE BRIDGE #112 OVER REEDY FORK CREEK SMITH-ROWE, LLC Howell, Bobby J $6,733,158.50 5/31/2022 12/12/2024 7/25/2022 12/26/2024 48.00 21 .57 <br /> ON NC 87 IN OSSIPEE <br /> C204572 U-6010 INTERSECTION IMPROVEMENTS ON US 70 (SOUTH APAC ATLANTIC INC. Howell, Bobby J $13,975,135.25 7/6/2022 1/13/2025 9/29/2022 1/13/2025 37.50 8.36 <br /> CHURCH STREET) AT SR 1226/SR 1311 THOMPSON ARTHUR <br /> (UNIVERSITY DRIVE) IN BURLINGTON DIVISION <br /> C204603 1-5711 1-40/1-85 AND SR 1007 (MEBANE OAKS ROAD) IN ZACHRY Howell, Bobby J $12,865,732.71 4/26/2021 1/11/2024 4/26/2021 2/8/2024 75.00 67.43 <br /> MEBANE INTERCHANGE IMPROVEMENTS CONSTRUCTION <br /> CORPORATION <br /> C204626 RESURFACE 1 SECTION OF NC 87, 1 SECTION OF FSC II LLC DBA FRED Lorenz, PE, Kris $4,639,570.37 6/3/2021 11/1/2022 6/28/2021 3/31/2023 100.00 91 .68 <br /> NC 49 AND 21 SECTIONS OF SECONDARY ROADS SMITH COMPANY <br /> C204788 RESURFACING OF SIX SECONDARY ROADS VECELLIO & GROGAN Howell, Bobby J $4,366,972.22 3/15/2023 9/15/2024 3/6/2023 9/15/2024 6.50 58.38 <br /> INC DBA SHARPE <br /> BROTHERS <br /> D000559 RESURFACE A SECTION OF NC 100, NC 49, US 70 & BOGGS CONTRACTING, Howell, Bobby J $2,740,478.60 5/1/2022 6/30/2022 5/20/2022 6/30/2023 64.79 49.23 <br /> 3 SECONDARY ROADS IN ALAMANCE COUNTY INC <br /> DG00574 RESURFACING OF ONE PRIMARY & SIX APAC ATLANTIC INC. Howell, Bobby J $1 ,588,752.25 6/1/2022 6/30/2023 7/18/2022 6/30/2023 42.00 91 .09 <br /> SECONDARY ROADS IN ALAMANCE COUNTY THOMPSON ARTHUR <br /> DIVISION <br /> DG00589 HS-2007C INSTALLATION THERMOPLASTIC PAVEMENT TRP CONSTRUCTION Cvijetic, PE, $1 ,494,249.58 3/15/2023 11/7/2023 <br /> MARKINGS ON VARIOUS SECONDARY ROUTES IN GROUP LLC Bojan <br /> DIVISION 7 <br /> D000596 R-57871 INSTALLATION OF ADA COMPLIANT CURB RAMPS CAROLINA GROUP Howell, Bobby J $312,070.00 10/12/2022 2/28/2024 11/9/2022 <br /> AT VARIOUS ROUTES PROPERTIES LLC DBA <br /> CAROLINA GROUP <br /> CONTRACTING <br /> Page 1 of 1 <br />