Browse
Search
5.22.23 OUTBoard Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2023
>
5.22.23 OUTBoard Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 4:47:57 PM
Creation date
8/11/2023 4:35:19 PM
Metadata
Fields
Template:
BOCC
Date
5/22/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
5.22.23 Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCDOT PROJECTS LOCATED IN BGUMPO - UNDER DEVELOPMENT <br /> Let/Start Draft STIP Completion <br /> TIP/WBS # Description Date Let Date Date Cost Status Project Lead <br /> W-5807B Installation of ADA curb ramps and pedestrian accessible Oct. 2021 N/A FY2022 $75,000 Final inspection completed 1/18/23 Dawn McPherson <br /> 48952.1 .3 signals on SR 1301 (Boone Station Drive) at SR 1301 (St. Chad Reimakoski <br /> 48952.2.3 Marks Church Road) and Boone Station Drive (non-system) <br /> 48952.3.3 at Glidewell Road/Tiki Lane (non-system) in Burlington <br /> 47786 Intersection improvements on SR 1007 (Mebane Oaks Rd) at 6/22/2022 N/A Feb. 2023 $898,500 Construction completed. Chad Reimakoski <br /> SM-5707B SR 2126/2128 (Old Hillsborough Rd) south of Mebane. Derek Dixon <br /> 47903.2.1 Improvements include addition of left and right turn lanes, <br /> radii widening, signal installation, resurfacing, and pavement <br /> markings. <br /> SS-6207J Installation of all way stop (AWS) and overhead flasher at the Oct. 2022 N/A 11/9/22 $23,000 Construction completed - Dawn McPherson <br /> 50667 intersection of NC 49 at SR 1130 (Friendship Patterson Mill inspection pending <br /> Road) south of Burlington. <br /> SM-6107B SR 1167 (Longpine Road) at SR 1146 (Kirkpatrick Road). 6/2/23 N/A 10/31/23 $185,000 Materials ordered, installation Dawn McPherson <br /> 50522 Installation of a modular mini-roundabout. expected in Summer 2023 Derek Dixon <br /> W-5707D Safety Improvements including signage and pavement 6/15/23 N/A Nov. 2023 $450,000 Planning and design activities Dawn McPherson <br /> 44853.1 .4 markings to curve on NC 49 located between Buckingham underway; ROW acquisition <br /> 44853.2.4 Mountain Road and SR 2363 (Beale Road) in Snow Camp complete <br /> 44853.3.4 <br /> 17BP.7.C.18 Replace pipe on Swep-Sax Road/Darrell Newton Road 6/20/23 N/A FY2024 $500,000 Bids under review Tim Powers <br /> SS-6207G NC 87 (East Webb Avenue) at Flanner Street, Pedestrian 6/30/23 N/A 7/1/23 $60,000 Planning and design activities Dawn McPherson <br /> 50502 signal installation and crosswalk pavement markings. underway. <br /> HS-2007F NC 87 at 1-40 installation of pedestrian improvements 9/23/23 N/A Late 2023 $86,500 Planning and design activities Dawn McPherson <br /> underway <br /> EB-5885 Construct sidewalk on US 70 (N. Church St.) from Beaumont 9/29/23 FY2023 FY 2025 $120,000 Municipal Agreement required to City of <br /> Avenue to SR 1716 (Graham Hopedale Road) begin work Burlington/Stephen <br /> Robinson <br /> U-6017 Intersection improvements at NC 54 (East Harden St.) and 10/19/23 FY2023 FY2025 $2,100,000 Planning and design activities Chris Smitherman <br /> 47162.1 .1 NC 49 (East Elm St.) in Graham 6/15/23 underway - ROW acquisitions <br /> 47162.2.1 complete - Utility relocations <br /> 47162.3.1 underway - schedule change <br /> pending <br /> BGUMPO May 2023 <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.