Browse
Search
4.17.23 OUTBoard Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2023
>
4.17.23 OUTBoard Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 4:49:39 PM
Creation date
8/11/2023 4:33:12 PM
Metadata
Fields
Template:
BOCC
Date
4/17/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
4.17.23 Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project 1 23GOT_CD4 Project Transit Project Other Bus <br /> Category Infrastructure Subcategory Service <br /> Project Description Project <br /> The FY24 request includes phase II of the project, which Project Title New Regional Transit Facility <br /> consists of land aquisition, design, and construction of (Orange County Share) <br /> a new regional transit center(RTC). The current feasi- Agency GoTriangle <br /> blity study includes an evaluation of the current facility <br /> and identification of necessary passenger amenities and FY24 Costs $350,000 <br /> infrastructure improvements, and a feasibility study to <br /> evaluate the potential new locations for the RTC, taking <br /> into consideration current and future planned routes, land FY25 Programmed $700,000 <br /> use, supply, and price. This study will be used to inform Costs <br /> the location and design of phase II. The current feasiblity <br /> study is funded by county transit plans in Wake, Durham, Start Date June 2023 <br /> and Orange counties. <br /> The GoTriangle Regional Transit Center(RTC) is the <br /> primary hub for GoTriangle regional bus services con- <br /> necting Wake, Orange, and Orange Counties. This study <br /> includes an evaluation of the current facility and identifi- <br /> cation of necessary passenger amenities and infrastruc- <br /> ture improvements, and a feasibility study to evaluate the <br /> potential new locations for the RTC, taking into consider- <br /> ation current and future planned routes, land use, supply, <br /> and price. The current location of the RTC on Slater Road <br /> in Orange creates overlapping routes leading to ineffi- <br /> ciency, and is not proximate to 1-40 which causes delays <br /> and reduced reliability during peak commuting times. <br /> The feasibility study is evaluating location options that <br /> improve operating efficiency and reliability, connections to <br /> planned BRT and CRT, as well as potential for transit-ori- <br /> ented development. <br /> DRAFT <br /> FEBRUARY 15, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.