Browse
Search
4.17.23 OUTBoard Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2023
>
4.17.23 OUTBoard Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 4:49:39 PM
Creation date
8/11/2023 4:33:12 PM
Metadata
Fields
Template:
BOCC
Date
4/17/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
4.17.23 Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHEREAS,Orange County will take a proactive approach to develop an effective Transportation <br /> Safety Plan built on a foundation of Safe Systems principles and elements that will translate into <br /> evidence-based implementation processes; and <br /> WHEREAS, creating safer streets is likely to encourage the use of more active transportation <br /> options, thereby increasing population health, access to healthy foods and active transportation <br /> options; and <br /> WHEREAS, Orange County Transportation Services will plan and implement transportation <br /> projects with equity at its forefront, striving to impact the most vulnerable and dependent users of <br /> the most dangerous roadways of the transportation network in the effort to ensure outcomes will <br /> be experienced equitably throughout the region; <br /> NOW THEREFORE, BE IT RESOLVED, that Orange County agrees to support, plan and <br /> program projects that commit to a goal of zero deaths and serious injuries that are a result of crashes <br /> by 2050; and <br /> BE IT FURTHER RESOLVED that Orange County is dedicated to measuring the progress, <br /> challenges, and successes of the Vision Zero commitment and will do so with tangible,reportable <br /> metrics that will be reported upon on an annual basis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.