Orange County NC Website
MPO Board 2/8/2023 Item 20 <br /> NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br /> TIP/WBS # Description LET/Start Draft STIP Completion Cost Status Project Lead <br /> Date Let Date Date <br /> 1-5984 Interchange improvements at 1-85 and NC 86 in 11/21/2028 Funded for FY2031 $20,900,000 PE funding approved 10/10/17, Planning Laura Sutton <br /> 47530.1 .1 Hillsborough Preliminary and Design activities underway, <br /> 47530.2.1 Engineering Coordinate with 1-0305 and 1-5959 <br /> 47530.3.1 Only <br /> 1-0305 Widening of 1-85 from west of SR1006 (Orange Grove Road) 1/1/2040 Funded for FY2044 $132,000,000 PE funding approved 6/5/18, Planning and Laura Sutton <br /> 34142.1 .2 in Orange Co. to west of SR 1400 (Sparger Road) in Orange Preliminary design activities underway, Project <br /> 34142.2.2 Co. Engineering reinstated per 2020-2029 STIP (funded <br /> 34142.3.2 Only project) and delete project 1-5983 <br /> DCHCMPO Jan. 2023 <br /> Page 4 <br />