Orange County NC Website
NCDOT PROJECTS LOCATED IN BGUMPO - UNDER DEVELOPMENT <br /> Let/Start Draft STIP Completion <br /> TIP/WBS # Description Date Let Date Date Cost Status Project Lead <br /> U-6014 Widen SR 1716 (Graham-Hopedale Rd) to multi-lanes with 3/18/25 FY2025 FY2027 $13,200,000 Planning and design activities Rob Weisz <br /> 47159.1 .1 Bicycle/Pedestrian accommodations from SR 1720 (West underway, Includes EB-5882 <br /> 47159.2.1 Hanover Rd) to Morningside Drive in Burlington <br /> 47159.3.1 <br /> U-6131 Install dual left turn lanes in westbound direction at NC 54 1/15/26 FY2026 FY2028 $3,500,000 Planning and design activities Brian Ketner <br /> (W. Harden Street) at NC 49 (Maple Ave.) in Burlington pending <br /> B-6052 Replace bridge 68 over NCRR / Norfolk Southern Railroad 1/20/26 FY2026 FY2027 $2,500,000 PE funding approved 5/6/19 Kevin Fischer <br /> 48709.1 .1 on SR 1928 (Trollingwood Road) in Haw River <br /> 48709.2.1 <br /> 48709.3.1 <br /> EB-5988 Construct sidewalk on Lee Ave./W. Lebanon Ave. to SR 1454 8/25/2026 FY2026 FY2028 $272,000 Municipal Agreement required to Town of <br /> (W. Haggard Ave.) in Elon begin work Elon/Stephen <br /> Robinson <br /> U-6114 Install traffic signal and add turn lanes at NC 62 (Alamance 10/20/2026 Funded for FY2028 $900,000 Planning and design activities Robbie Weisz <br /> Road) at SR 1155 (Hatchery Road)/Bonnie Lane intersection Preliminary pending <br /> in Burlington Engineering <br /> only <br /> BP7-R016 Replace Bridge #113 on SR 1003 (Lindley Mill Road) 11/5/2026 N/A FY2028 $1 ,200,000 Planning and design activities Tim Powers <br /> underway - Plans at 25% <br /> BP7-R018 Replace Bridge #254 on SR 2104 (Mandale Road) 9/2/2027 N/A FY2029 $700,000 Planning and design activities Tim Powers <br /> pending <br /> BP7-R019 Replace Bridge #103 on SR 2182 (Perry Road) 10/7/2027 N/A FY2029 $700,000 Planning and design activities Tim Powers <br /> pending <br /> BP7-R023 Replace Bridge #238 on SR 2128 (Old Hillsborough Road) 12/2/2027 N/A FY 2029 $700,000 Planning and design activities Tim Powers <br /> underway <br /> 1-6009 Interchange improvements at 1-40/1-85 and SR 1158 6/7/29 Funded for FY2031 $936,000 Planning and design activities Brian Ketner <br /> 47962.1 .1 (Huffman Mill Road). Construct additional right turn lane on I- Preliminary pending <br /> 47962.2.1 40 WB Ramp and improve operations at SR 1308 (Garden Engineering <br /> 47962.3.1 Road) intersection in Burlington only <br /> U-6009 Widen and construct center turn lane on US70 (West Church 1/1/40 Funded for FY2040 $6,337,000 Planning and design activities Rob Weisz <br /> 47144.1 .1 St) from Tarleton Ave. to Fifth Street in Burlington Preliminary pending <br /> 47144.2.1 Engineering <br /> 47144.3.1 only <br /> BGUMPO Jan. 2023 <br /> Page 3 <br />