Orange County NC Website
MPO Board 01/11/2023 Item 17 <br /> NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description LET/Start Draft STIP Completion Cost Status Project Lead <br /> Date Let Date Date <br /> EB-5886A Construct sidewalk/MUP/bike lanes on Estes Drive from SR 9/17/2026 FY2026 FY2029 $848,000 Planning and design activities pending Town of <br /> 1772(North Greensboro Street)to south of Norfolk Southern Carrboro/Stephen <br /> Railroad Tracks in the Town of Carrboro Robinson <br /> BP7-R015 Replace Bridge#86 on SR 1942(Jones Ferry Road) 10/1/2026 N/A FY2029 $1,700,000 Planning and design activities underway Tim Powers <br /> 1-5958 Pavement Rehabilitation on 1-40/1-85 from West of SR 1114 11/17/2026 FY2027 FY2028 $8,690,000 Planning and design activities pending Chad Reimakoski <br /> 45910.1.1 (Buckhorn Road)to West of SR 1006(Orange Grove Road) <br /> 45910.3.1 <br /> B-5733 Replace Bridge#39 over Booker Creek in Chapel Hill on SR 1/19/2027 N/A FY2029 $5,100,000 Planning and design activities pending Kevin Fischer <br /> 1010(E. Franklin St.) <br /> BR-0195 Replace Bridge#31 on SR 1010(Franklin Street)over Bolin 2/16/2027 N/A FY2029 Pending Planning and design activities underway Kevin Fischer <br /> Creek in Chapel Hill <br /> 1-5967 Interchange improvements at 1-85 and SR 1009(South 10/19/2027 FY2031 FY2030 $16,900,000 PE funding approved 9/8/17, Planning and Laura Sutton <br /> 45917.1.1 Churton Street)in Hillsborough Design activities underway,Coordinate <br /> 45917.2.1 with 1-0305 and U-5845 <br /> 45917.3.1 <br /> 1-5959 Pavement Rehabilitation on 1-85 from West of SR 1006 11/16/2027 N/A FY2029 $11,156,000 Planning and design activities pending Chad Reimakoski <br /> 45911.1.1 (Orange Grove Road)to Durham County line <br /> 45911.3.1 <br /> BR-0247 Replace Bridge#29 on US 70 Business/NC 86 over Cates 11/16/2027 N/A FY2029 Pending Preliminary activities pending Kevin Fischer <br /> Creek <br /> R-5821A Construct operational improvements including 6/20/2028 Funded for FY2031 $7,000,000 PE funding approved 10/10/17,design Rob Weisz <br /> 47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR Preliminary activities currently suspended, <br /> 47093.2.2 1006(Orange Grove Road)to SR 1107/SR 1937(Old Engineering Coordinating with NC54 West Corridor <br /> 47093.3.2 Fayetteville Road). Only Study <br /> U-5845 Widen SR 1009(South Churton Street)to multi-lanes from 1- 7/18/2028 FY2031 FY2031 $49,238,000 PE funding approved 5/14/15, Planning Laura Sutton <br /> 50235.1.1 40 to Eno River in Hillsborough and Design activities underway, <br /> 50235.2.1 Coordinate with 1-5967 <br /> 50235.3.1 <br /> DCHCMPO Dec.2022 <br /> Page 3 <br />