Browse
Search
1.26.23 OUTBoard Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2023
>
1.26.23 OUTBoard Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 4:51:21 PM
Creation date
8/11/2023 4:32:20 PM
Metadata
Fields
Template:
BOCC
Date
1/26/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
1.26.23 Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MPO Board 01/11/2023 Item 17 <br /> NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description LET/Start Draft STIP Completion Cost Status Project Lead <br /> Date Let Date Date <br /> SS-6007AD Convert intersection from two way stop to all way stop at the 3/18/2022 N/A 5/18/2022 $28,000 Construction completed-pending final Dawn McPherson <br /> 49823.1.1 intersection of SR 1710(Old NC 10)and SR 1712 inspection <br /> 49823.3.1 (University Station Road)west of Durham <br /> SS-6207A NC 54 Pedestrian improvements between SR 1902 10/31/2022 N/A 6/30/2023 $171,000 Planning and design activities underway Dawn McPherson <br /> 50337 (Manning Drive)and SR 1937(Old Fayetteville Road)in <br /> Chapel Hill and Carrboro. Improvements will include refuge <br /> islands,crosswalks and pedestrian signals. Improvements <br /> to be completed by state forces. <br /> EB-5721 Upgrade existing off-road path and construct new section of 1/26/2023 FY2022 FY2025 $2,400,000 Letting preparations pending Town of Chapel <br /> path of Bicycle Route#1 from Cleland Drive to Willow Drive Hill/Stephen Robinson <br /> in Chapel Hill <br /> BL-0044 NC 54 from Westbrook Drive in Carrboro to west of US 2/16/2023 FY2023 2/28/2024 $1,311,000 Planning and design activities underway Chad Reimakoski <br /> 49998.1.1 15/501/NC 86(South Columbia Street)interchange in <br /> Chapel Hill. Construct sidewalk and install pedestrian <br /> signals,crosswalks,and refuge islands at selected locations. <br /> U-4726DF Bicycle detection at signalized intersections in Carrboro 4/30/2023 N/A FY2025 $36,000 Plans at 90%completion Town of <br /> Carrboro/Stephen <br /> Robinson <br /> U-47261K Construct sidewalk/MUP on Homestead Road from Seawell 4/1/2023 N/A FY2025 $1,300,000 Letting preparations pending Town of Chapel <br /> School Road to Weaver Dairy Road in Chapel Hill Hill/Stephen Robinson <br /> C-5181 Jones Creek Greenway Project-Fill Gap between the 6/30/2023 FY2023 FY2025 $654,000 Planning and design activities underway Town of <br /> Carrboro Upper Bolin Trail and Twin Creeks Greenway and Carrboro/Stephen <br /> also implement program to support on-vehicle trips to Morris Robinson <br /> Grove Elementary School <br /> P-5701 Construct Platform, Passenger Rail Station Building at 6/30/2023 N/A FY2025 $7,200,000 PE funding scheduled 7/1/2020 Matthew Simmons <br /> 46395.1.1 Milepost 41.7 Norfolk Southern H-line in Hillsborough <br /> 46395.3.1 <br /> EL-4828A Construct Morgan Creek Greenway Phase 1 in Carrboro 7/31/2023 N/A FY2026 $372,000 Planning and design activities underway Town of <br /> Carrboro/Stephen <br /> Robinson <br /> HL-0045 Repair Bridge#241 on Exchange Park Lane over Eno River 8/31/2023 FY2023 FY2026 $153,800 Planning and design activities underway Town of <br /> from South Churton Street to Faribult Lane in Hillsborough Hillsborough/Stephen <br /> Robinson <br /> DCHCMPO Dec.2022 <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.