Orange County NC Website
_ Current County priority as highway project <br /> Attachment 3: Draft Burlington-Graham Metropolitan Planning Organization (BGMPO) Project List New Project <br /> MPO/ Recommendation <br /> # RPO Project Description/Need AADT 2010 -2016 Crashes 2006-2016 2018 Results <br /> (SPOT 5.0) Staff OUTBoard <br /> Description: Widen US-70 and improve intersections from Buckhorn Road (SR-1114)to Durham Total 1148 <br /> County with NCDOT standard street cross-section 4G (110' row, 17.5' median, 11'travel lanes, 5' West 6400 - 6200 10 fatal <br /> bike lane, c&g, and sidewalk), add turn lanes and safety improvements at NC-86, St. Mary's Road <br /> DCHC/BG Improvements** (SR-1002), Efland Cedar Grove Road (SR-1004), Frazier Road (SR-1310), Richmond Road (SR- 100 minor injury 12 serious injury N/A New Project Not <br /> Improvements" Recommended <br /> 1312), Brookhollow Road (SR-1324), Faucette Mill Road (SR-1328), Miller Road (SR-1555), East 12000- 14000 220 possible injury <br /> Lawrence Road (SR-1561), Palmers Grove Church Road (SR-1562), Pleasant Green Road (SR- 706 property damage <br /> 1567), Orange High School Road SR-1588 , and N Scotswood Boulevard SR-2300 . <br /> County Priority <br /> BG Mattress Factory Description: Construct a new interchange at the existing grade-separated crossing of Mattress N/A County priority Remain County <br /> Road Interchange Factory Road and 1-85/1-40 Not submit to priority <br /> NCDOT for P5.0 <br /> Description: Extend Mattress Factory Road northward across East Washington Street and the North 2200-2000 <br /> Total 18 County Priority <br /> Mattress Factory 1 serious injury <br /> BG Road Extension to NCRR/Norfolk Southern railroad right-of-way to intersect U.S. 70 and close the existing railroad 3 minor injury Not submit to County priority Remain County <br /> U.S. 70 crossover road connecting East Washington Street and U.S. 70 approximately 240 feet to the east 1 possible injury NCDOT for P5.0 priority <br /> of the intersection of Mattress Factory Road and East Washington Street. South 1300 - 1800 13 property damage <br /> Total 124 County Priority <br /> Buckhorn Road <br /> Description: Widen Buckhorn Road from U.S. 70 to West Ten Road (SR1144)to multiple lanes with North 6800-6600 2 serious injury Remain County <br /> BG (SR 1114) bicycle and pedestrian facilities with grade separation over railroad to US-70. 14 minor injury Not submit to County priority priority <br /> Widening" 18 possible injury NCDOT for P5.0 <br /> South 2500 - 3000 90 property damage <br /> Total 100 <br /> Lebanon Road East 2600—3000 2 serious injury <br /> Description: Intersection and safety improvements along Lebanon Road (SR-1306)from Mill Creek New County <br /> DCHC/BG (SR-1306) 12 minor injury N/A New Project <br /> Improvements** Road (SR-1345)to Efland-Cedar Grove Road (SR-1004) 11 possible injury priority <br /> West 2100-2300 75 property damage <br /> Notes: <br /> * STI Law§ 136-189.11.Transportation Investment Strategy Formula section (d).(3).c.—The Department shall not provide financial support for independent bicycle and pedestrian improvement projects. <br /> ** Sidewalk subject to NCDOT sidewalk cost share policy 40%Orange County for Vt 5' of sidewalk, 100%Orange County for any additional sidewalk. <br />