Browse
Search
1.26.23 OUTBoard Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2023
>
1.26.23 OUTBoard Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 4:51:21 PM
Creation date
8/11/2023 4:32:20 PM
Metadata
Fields
Template:
BOCC
Date
1/26/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
1.26.23 Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ Current County priority as highway project <br /> Attachment 2: Draft Durham-Chapel Hill-Carrboro (DCHC) MPO Project List New Project <br /> Recommendations <br /> MPO/ AADT 2010 - Crashes 2006- <br /> Map RPO Project Description/Need 2016 2016 2018 Results <br /> Staff OUTBoard <br /> Description: Widen Dairyland Road (SR 1004/1113/1177)from Union Grove Church Road (SR 1111)to Orange Grove Road Not submit to <br /> (SR 1006)to include four(4)-foot paved shoulders. County priority <br /> NCDOT for P5.0 Dairyland Road redefined as County priority <br /> DCHC Need: This project would provide one segment of a bikeway connection through western Orange County from Carrboro to the N/A highway as highway <br /> Paved Shoulders Buckhorn Road and Mebane area and improve the safety of the subject thoroughfare for both bicyclists and motorized match No 20o o local project project <br /> vehicular travel. The project is not likely to score very high using the State's congestion and benefit-cost scoring factors and is (See#7) <br /> onlyeligible for fundingat the division tier. administration <br /> local ration <br /> Description: Construct a multi-use path connecting English Hill Lane to Buttonwood Drive. <br /> Not submit to Seek other <br /> Trail Connection Need: Project is recommended as an improvement in the Orange County Safe Routes to School Action Plan. An existing NCDOT for P5.0 Prohibited by funding source <br /> from English Hill barrier to pedestrians toward Orange High School and CW Stanford Middle School exists between residential areas along <br /> 26 DCHC N/A STI (e.g. DEAPR, <br /> Lane to and east of Buttonwood Drive and residential areas along and west of English Hill Lane. The improvement would provide a No 20% local § 136-189.11 Federal SDBG- <br /> Buttonwood Dr.* direct pedestrian connection from highly populated residential areas further west from the schools and make walking match or local DA) <br /> distances safer and more manageable. administration. <br /> Description: Construct a multi-use path connecting the southwest corner of Patriots Pointe to Timbers Drive to shorten <br /> walking distances for pedestrians. <br /> Not submit to Seek other <br /> Trail Connection NCDOT for P5.0 Prohibited by funding source <br /> from Patriot's Need: Project is recommended as an improvement in the Orange County Safe Routes to School Action Plan. An existing <br /> 27 DCHC Pointe to Timbers barrier to pedestrians exists between Patriots Point Apartments and Timbers Drive such that long walking distances are N/A No 20% local STI (e.g. DEAPR, <br /> § 136-189 <br /> Dr.* required for pedestrians from Patriots Pointe to access the New Grady Brown Elementary School and Cedar Ridge High match or local .11 Federal SDBG- <br /> School along Orange Grove Road with no designated pedestrian facilities. The improvement would provide a direct administration. DA) <br /> pedestrian connection from Patriots Point to Timbers Drive and Orange Grove Road in the direction of the schools that make <br /> walking distances more manageable. <br /> Notes: <br /> * STI Law§ 136-189.11.Transportation Investment Strategy Formula section (d).(3).c.—The Department shall not provide financial support for independent bicycle and pedestrian improvement projects. <br /> ** Sidewalk subject to NCDOT sidewalk cost share policy 40%Orange County for V 5' of sidewalk, 100%Orange County for any additional sidewalk. <br />
The URL can be used to link to this page
Your browser does not support the video tag.