Browse
Search
9.21.22 OUTBoard Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2022
>
9.21.22 OUTBoard Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 4:25:22 PM
Creation date
8/11/2023 4:17:35 PM
Metadata
Fields
Template:
BOCC
Date
9/21/2022
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br /> TIP/WBS # Description LET/Start Completion Cost Status Project Lead <br /> Date Date <br /> SS-6007AD Convert intersection from two way stop to all way stop at the 5/31/2022 Sep. 2022 $28,000 Construction completed - pending final Dawn McPherson <br /> 49823.1 .1 intersection of SR 1710 (Old NC 10) and SR 1712 (University inspection <br /> 49823.3.1 Station Road) west of Durham <br /> SS-4907CD Horizontal curve improvements on SR 1710 (Old NC 10) 6/1/2022 Nov. 2022 $261 ,000 Planning and Design activities currently on Chad Reimakoski <br /> 47936.1 .1 west of SR 1561/SR 1709 (Lawrence Road) east of hold - Project shelved due to minimal <br /> 47936.2.1 Hillsborough. Improvements consist of wedging pavement crash rate during observation period. To <br /> 47936.3.1 and grading shoulders. be resubmitted for federal funding. <br /> P-5701 Construct Platform, Passenger Rail Station Building at 6/30/2023 FY2025 $7,200,000 PE funding scheduled 7/1/2020 Matthew Simmons <br /> 46395.1 .1 Milepost 41 .7 Norfolk Southern H-line in Hillsborough <br /> 46395.3.1 <br /> SS-6207A NC 54 Pedestrian improvements between SR 1902 (Manning 10/31/2022 6/30/2023 $171 ,000 Planning and design activities underway. Dawn McPherson <br /> 50337 Drive) and SR 1937 (Old Fayetteville Road) in Chapel Hill <br /> and Carrboro. Improvements will include refuge islands, <br /> crosswalks and pedestrian signals. Improvements to be <br /> completed by state forces. <br /> BL-0044 NC 54 from Westbrook Drive in Carrboro to west of US 2/16/2023 2/28/2024 $1 ,311 ,000 Planning and design activities underway. Chad Reimakoski <br /> 49998.1 .1 15/501/NC 86 (South Columbia Street) interchange in Chapel <br /> Hill. Construct sidewalk and install pedestrian signals, <br /> crosswalks, and refuge islands at selected locations. <br /> 1-5958 Pavement Rehabilitation on 1-40/1-85 from West of SR 1114 11/17/2026 FY2028 $8,690,000 PE funding approved 10/10/17 Chad Reimakoski <br /> 45910.1 .1 (Buckhorn Road) to West of SR 1006 (Orange Grove Road) <br /> 45910.3.1 <br /> 1-5967 Interchange improvements at 1-85 and SR 1009 (South 10/19/2027 FY2030 $16,900,000 PE funding approved 9/8/17, Planning and Laura Sutton <br /> 45917.1 .1 Churton Street) in Hillsborough Design activities underway, Coordinate <br /> 45917.2.1 with 1-0305 and U-5845 <br /> 45917.3.1 <br /> DCHCMPO Aug. 2022 <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.