Browse
Search
9.21.22 OUTBoard Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2022
>
9.21.22 OUTBoard Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 4:25:22 PM
Creation date
8/11/2023 4:17:35 PM
Metadata
Fields
Template:
BOCC
Date
9/21/2022
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCDOT PROJECTS LOCATED IN BGUMPO - UNDER DEVELOPMENT <br /> TIP/WBS # Description Let/Start Completion Cost Status Project Lead <br /> Date Date <br /> U-6017 Intersection improvements at NC 54 (East Harden St.) and 6/15/23 FY2025 $2,100,000 Planning and design activities Rob Weisz <br /> 47162.1 .1 NC 49 (East Elm St.) in Graham underway - ROW underway <br /> 47162.2.1 <br /> 47162.3.1 <br /> W-5707D Safety Improvements to curve on NC 49 located between 6/15/23 Nov. 2023 $450,000 Planning and design activities Chad Reimakoski <br /> 44853.1 .4 Buckingham Mountain Road and SR 2363 (Beale Road) in 6/16/22 Nov. 2022 underway; ROW acquisition <br /> 44853.2.4 Snow Camp underway <br /> 44853.3.4 <br /> U-6013 Widen NC 119 to multi-lanes from SR 1981 (Trollingwood- 12/19/23 FY2026 $6,200,000 Planning and design activities Rob Weisz <br /> 47158.1 .4 Hawfields Rd)/ SR 2126 (Old Hillsborough Rd) to Lowes Blvd underway, ROW underway <br /> 47158.2.4 (non-system) in Mebane. <br /> 47158.3.4 <br /> U-6011 Intersection improvements at US 70 (South Church Street) 8/20/24 FY2026 $2,400,000 Planning and design activities Brian Ketner <br /> 47146.1 .1 and SR 1158 (Huffman Mill Rd) in Burlington underway - ROW acquisition <br /> 47146.2.1 pending <br /> 47146.3.1 <br /> U-5844 Construct multi-lanes on NC62 from SR 1430 (Ramada Road) 3/18/25 FY2028 $10,000,000 Planning and design activities Rob Weisz <br /> 50234.1 .1 to US 70 (South Church Street) in Burlington underway <br /> 50234.2.1 <br /> 50234.3.1 <br /> U-6014 Widen SR 1716 (Graham-Hopedale Rd) to multi-lanes with 3/18/25 FY2027 $13,200,000 Planning and design activities Rob Weisz <br /> 47159.1 .1 Bicycle/Pedestrian accommodations from SR 1720 (West underway, Includes EB-5882 <br /> 47159.2.1 Hanover Rd) to Morningside Drive in Burlington <br /> 47159.3.1 <br /> B-6052 Replace bridge 68 over NCRR / Norfolk Southern Railroad on 1/20/26 FY2027 $2,500,000 PE funding approved 5/6/19 Kevin Fischer <br /> 48709.1 .1 SR 1928 (Trollingwood Road) in Haw River <br /> 48709.2.1 <br /> 48709.3.1 <br /> 1-6009 Interchange improvements at 1-40/1-85 and SR 1158 (Huffman 6/27/29 FY2031 $936,000 PE funding approved 6/5/18 Brian Ketner <br /> 47962.1 .1 Mill Road). Construct additional right turn lane on 1-40 WB <br /> 47962.2.1 Ramp and improve operations at SR 1308 (Garden Road) <br /> 47962.3.1 intersection in Burlington <br /> BGUMPO Aug. 2022 <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.