Orange County NC Website
NCDOT PROJECTS LOCATED IN BGUMPO - UNDER DEVELOPMENT <br /> TIP/WBS # Description Let/Start Completion Cost Status Project Lead <br /> Date Date <br /> SS-4907BQ Intersection improvements (All Way Stop) at SR 1005 5/1/21 Jun. 2021 $22,500 R/W Construction completed - pending Derek Dixon <br /> 44757.1 .1 (Greensboro-Chapel Hill Road) at SR 2369 (Sylvan $153,000 CON final inspection <br /> 44757.2.1 School Road) and SR 2371 (Pleasant Hill Road) in Snow <br /> 44757.3.1 Camp. <br /> 48798 Installation of crosswalks and pedestrian signals and update 8/4/21 Jul. 2022 $150,394 Construction completed - Punchlist Dawn McPherson <br /> curb ramps at the intersection of US 70 (South Church Street) items underway Derek Dixon <br /> and Edgewood Avenue (non-system) in Burlington. <br /> W-5807B Installation of ADA curb ramps and pedestrian accessible Oct. 2021 FY2022 $75,000 Scheduled to be completed 8/12/22 Dawn McPherson <br /> 48952.1 .3 signals on SR 1301 (Boone Station Drive) at SR 1301 (St. Chad Reimakoski <br /> 48952.2.3 Marks Church Road) and Boone Station Drive (non-system) <br /> 48952.3.3 at Glidewell Road/Tiki Lane (non-system) in Burlington <br /> SS-6007AE Convert intersection from two way stop to all way stop at SR 3/9/22 FY2023 $30,000 Planning and design activities Dawn McPherson <br /> 49822.1 .1 1005 (E. Greensboro Chapel Hill Road) at SR 2351 (Bethel underway - installation of all way <br /> 49822.3.1 South Fork Road) in Snow Camp. stop installed 3/9/2022, <br /> inspection 5/16/22 <br /> 47786 Intersection improvements on SR 1007 (Mebane Oaks Rd) at 6/22/22 Aug. 2022 $898,500 Construction to begin once utility Chad Reimakoski <br /> SM-5707B SR 2126/2128 (Old Hillsborough Rd) south of Mebane. 7/1/22 relocations are complete Derek Dixon <br /> 47903.2.1 Improvements include addition of left and right turn lanes, <br /> radii widening, signal installation, resurfacing, and pavement <br /> markings. <br /> SM-6107B SR 1167 (Longpine Road) at SR 1146 (Kirkpatrick Road). 10/15/22 4/1/23 $185,000 Planning and design activities Dawn McPherson <br /> 50522 Installation of a modular mini-roundabout. underway. <br /> SS-6207G NC 87 (East Webb Avenue) at Flanner Street, Pedestrian 4/1/23 7/1/23 $60,000 Planning and design activities Dawn McPherson <br /> 50502 signal installation and crosswalk pavement markings. underway. <br /> BGUMPO Aug. 2022 <br /> Page 1 <br />