Orange County NC Website
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br /> TIP/WBS # Description LET/Start Completion Cost Status Project Lead <br /> Date Date <br /> 1-5959 Pavement Rehabilitation on 1-85 from West of SR 1006 11/16/2027 FY2029 $11 ,156,000 PE funding approved 10/10/17, Coordinate Chad Reimakoski <br /> 45911 .1 .1 (Orange Grove Road) to Durham County line with 1-5967, 1-5984 and 1-0305 <br /> 45911 .3.1 <br /> R-5821A Construct operational improvements including 6/20/2028 FY2031 $7,000,000 PE funding approved 10/10/17, design Rob Weisz <br /> 47093.1 .2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 activities currently suspended, <br /> 47093.2.2 (Orange Grove Road) to SR 1107 /SR 1937 (Old Fayetteville Coordinating with NC54 West Corridor <br /> 47093.3.2 Road). Study <br /> U-5845 Widen SR 1009 (South Churton Street) to multi-lanes from 1- 7/18/2028 FY2031 $49,238,000 PE funding approved 5/14/15, Planning Laura Sutton <br /> 50235.1 .1 40 to Eno River in Hillsborough and Design activities underway, <br /> 50235.2.1 Coordinate with 1-5967 <br /> 50235.3.1 <br /> 1-5984 Interchange improvements at 1-85 and NC 86 in 11/21/2028 FY2031 $20,900,000 PE funding approved 10/10/17, Planning Laura Sutton <br /> 47530.1 .1 Hillsborough and Design activities underway, <br /> 47530.2.1 Coordinate with 1-0305 and 1-5959 <br /> 47530.3.1 <br /> 1-0305 Widening of 1-85 from west of SR1006 (Orange Grove Road) 1/1/2040 FY2044 $132,000,000 PE funding approved 6/5/18, Planning and Laura Sutton <br /> 34142.1 .2 in Orange Co. to west of SR 1400 (Sparger Road) in Orange design activities underway, Project <br /> 34142.2.2 Co. reinstated per 2020-2029 STIP (funded <br /> 34142.3.2 project) and delete project 1-5983 <br /> DCHCMPO Aug. 2022 <br /> Page 2 <br />