Browse
Search
2023-368-E-AMS-Abacus Builders- PFPC Freezer Roof - CO 1 Add additional roof joists
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-368-E-AMS-Abacus Builders- PFPC Freezer Roof - CO 1 Add additional roof joists
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 8:44:54 AM
Creation date
8/9/2023 8:44:34 AM
Metadata
Fields
Template:
Contract
Date
7/31/2023
Contract Starting Date
7/31/2023
Contract Ending Date
8/2/2023
Contract Document Type
Contract
Amount
$7,800.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W12X14 W12X14 <br />W12X14W12X14 800S200-68 @ 16" O.C. <br />1 2 3 <br />B <br />A <br />17' - 6"17' - 7" <br />W14X2220' - 5 1/2"9 1/2"1 <br />S.6 <br />2 <br />S.6 <br />3 <br />S.6 <br />2 <br />S.6 <br />(-8") <br />(-8")(-8") <br />D.B.E. <br />(+10' -0") <br />D.B.E. <br />(+11' -0") <br />EXISITING BUILDING <br />KNEE BRACE (TYP) -SEE ELEVATION ON SHEET S.5 <br />(-8")(-8")1' - 0"1' - 0"1' - 0"8 1/2"EDGE OF DECK <br />1 <br />1 <br />3 3 <br />3 3 <br />2 <br />2 <br />2 <br />2 <br />1 <br /> 4' 4'NOTES: <br />1. DECK BEARING ELEVATION (D.B.E.) <br />2. TYPICAL ROOF CONSTRUCTION CONSISTS OF 1 1/2" TYP B 22 GA. METAL ROOF DECK PER DETAIL 6/S6 <br />3. (+X'-X") DENOTES ELEVATION ABOVE FINISHED FLOOR, U.N.O. <br />4. (-X") DENOTES TOP OF STEEL BELOW D.B.E. <br />CERT. NO. <br />52006REGISTEREDARCHITECTURALCOMPANY <br />N <br />ORTH CA R O L INA <br />SUMMITDESIGNAND E N GINEERIN <br />G <br />SERVICES,PLLCRALE I G HCreatively Inspired - Technically ExecutedLicense #: P-03392715 Ashton Dr., Suite 104Wilmington, NC 28412Voice: (910) 475-1208 Fax: (919) 322-0116www.SummitDE.comDESIGN AND ENGINEERING SERVICESPROJECT NO. <br />SHEET NO. <br />THIS DRAWING & THE DESIGN INTENT OF THIS <br />INSTRUMENT OF SERVICE IS THE VESTED <br />PROPERTY OF THE ARCHITECT & THE <br />ARCHITECTS CONSULTANTS, WHICH ARE NOT <br />TO BE REPRODUCED IN WHOLE OR IN PART BY <br />ANY MEANS OR METHOD WITHOUT EXPRESS <br />WRITTEN CONSENT OF THE ARCHITECT. THIS <br />INSTRUMENT OF SERVICE IS SOLELY & <br />EXCLUSIVELY FOR THE PURPOSE OF <br />CONSTRUCTING, USING, MAINTAINING, <br />ALTERING & ADDING TO THIS SPECIFIC <br />PROJECT AT IT'S SPECIFIC LOCATION. <br />COPYRIGHT 2015 <br />SUMMIT DESIGN AND <br />ENGINEERING SERVICES <br />C <br />ENGINEER OF RECORD <br />PROJECT MANAGER <br />DRAWN BY FIRST ISSUE DATE <br />500 VALLEY FORGE RDHILLSBOROUGH, NC, 2727818-0299 <br />S.3 <br />UO, SDH 3/14/2019 <br />JET <br />JET <br />ROOF FRAMING PLANFREEZER ADDITIONPIEDMONT FOOD & AGRIC.1/4" = 1'-0"1 ROOF PLAN <br />3 -27.5 <br />2 -18.8 <br />1 -11.2 <br />ZONE NET PRESSURE <br />(PSF) <br />ROOF UPLIFT SCHEDULE <br />THIS SHEET FOR ALTERNATE G-1 <br />ONLY -OMIT AT BASE BID <br />NOREVISIONSDATEBY1CODE CHANGE & DETAILREVISIONSJET7/11/23 <br />DocuSign Envelope ID: 7129A8A1-2F7E-4B61-B405-CDEC9F69B66B
The URL can be used to link to this page
Your browser does not support the video tag.