Orange County NC Website
<br />Community ORANGE COUNTY * State NC CID 370342 <br /> <br />COMMUNITY RATING SYSTEM ANNUAL RECERTIFICATION <br /> <br />Community Certifications CC-213-1 Edition: 2017 <br /> <br />Your community has been verified as receiving CRS credit for the following Activities. <br /> If your community is still implementing these activities the CRS coordinator is required <br />to put his or her initials in the blank (do not use a checkmark or an “X”) and attach the <br />appropriate items. A blank with no initials indicates you are not implementing that Ac- <br />tivity anymore, and will result in loss of points (and possible CRS Class). <br /> If the word “attached” is used you must provide the requested documentation for that <br />Activity. If no documentation has been acquired for that Activity, please explain why <br />there is no documentation from the past year. <br /> <br /> <br />___ 310 EC: We are maintaining Elevation Certificates, Floodproofing Certificates, Base- <br />ment Floodproofing Certificates, V Zone design certificates and engineered opening <br />certificates on all new construction and substantially improved buildings in our Spe- <br />cial Flood Hazard Area (SFHA) and make copies of all Certificates available at our <br />present office location. [____] Initial here is you have had no new construction or <br />substantial improvement in the SFHA in the last year. <br /> <br />___ 310 EC: Attached is the permit list for only new or substantially improved <br />structures in the SFHA that have been completed in the last year. We have per- <br />mitted ____new building and substantial improvements in the SFHA during this re- <br />porting period. <br /> <br />___ 310 EC: Attached are all the Certificates for new or substantially improved <br />structures that have been completed during this reporting period that are in- <br />cluded on the above permit list. (Note: The total number of Elevation and Flood- <br />proofing certificates should match the number of permits issued and completed within <br />the reporting period defined above. All permits issued for new construction or sub- <br />stantial improvement within the V zone should have both an Elevation Certificate and <br />a V Zone Certificate, and all buildings with basements within the basement exemp- <br />tion communities should have both an Elevation Certificate and a Basement Flood- <br />proofing Certificate). <br /> <br />___ 310 CCMP: We continue to follow our Construction Certificate Management Proce- <br />dures and update them when needed. <br /> <br />___ 320 MI 1: We are providing basic flood information to inquirers. We also continue to <br />provide the following to inquirers: <br /> ___ MI 2 additional FIRM information <br /> ___ MI 4 flood depth data <br /> ___ MI 7 natural floodplain functions <br /> <br />___ 320 MI: Attached is a copy of the publicity for the credited elements of this ser- <br />vice this year. <br /> <br />There were no new or substantially improved structures in SFHA for this reporting period. <br />There were no new or substantially improved structures in SFHA for this reporting period. <br />0 <br />C.S. <br />C.S. <br />C.S. <br />C.S. <br />C.S. <br />C.S. <br />C.S. <br />C.S. <br />C.S. <br />C.S. <br />DocuSign Envelope ID: EF0AC45F-DB3C-4655-87F2-206B2F4E6301