Browse
Search
2023-343-E-AMS-Warren-Hay-308 W Franklin St HVAC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-343-E-AMS-Warren-Hay-308 W Franklin St HVAC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 8:13:06 AM
Creation date
8/1/2023 8:13:00 AM
Metadata
Fields
Template:
Contract
Date
7/24/2023
Contract Starting Date
7/24/2023
Contract Ending Date
7/27/2023
Contract Document Type
Contract
Amount
$7,948.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WARREN - HAY <br />Mechanical Contractors <br />P.O. Box 818 • Hillsborough, NC 27278 <br />(919-732-4362) office (919-732-8660) Facsimile <br />www.warren-hay.com State License #7211 <br /> <br />6/27/2023 <br />OCPW <br /> <br />RE: 308 W. Franklin Street AC #4 <br /> <br />PROPOSAL <br /> <br /> We hereby submit specifications and estimates for: As noted: <br /> <br /> Provide labor and material necessary to remove one 5 ton AC condensing unit with cased coil, and <br />install new 5 ton AC condensing unit with cased coil <br /> Reconnect back to existing furnace, thermostat, duct work, gas piping, refrigerant line set, condensate <br />drain line, power and control wiring <br /> Provide and install new precast pad <br /> Pull all permits, provide a start up and one year warranty on all labor and materials provided <br /> <br />We propose hereby to furnish material and labor: $7,948.00 <br /> <br />Payment to be made at completion. <br />Exclusions: <br /> Concrete, roof, cutting, patching, <br /> <br />ACCEPTANCE OF PROPOSAL: The above prices, specifications and conditions are satisfactory <br />and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined <br />above. <br /> <br />Signature: __________________________________ <br /> <br /> <br />Date of Acceptance: _________________________ <br />Respectfully submitted by: Zach Vandeventer Commercial Division valid for 10 days zach.vandeventer@warren-hay.com <br />DocuSign Envelope ID: 1BB03F52-49BC-483F-93CC-2F0E977A61B3
The URL can be used to link to this page
Your browser does not support the video tag.