Browse
Search
2023-340-E-AMS-Warren Hay Mechanical Contractors-Justice Facility - Jury Lounge Replace Water source Heat Pump
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-340-E-AMS-Warren Hay Mechanical Contractors-Justice Facility - Jury Lounge Replace Water source Heat Pump
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 8:09:36 AM
Creation date
8/1/2023 8:09:26 AM
Metadata
Fields
Template:
Contract
Date
7/20/2023
Contract Starting Date
7/20/2023
Contract Ending Date
7/27/2023
Contract Document Type
Contract
Amount
$15,867.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WARREN - HAY <br />Mechanical Contractors <br />P.O. Box 818 • Hillsborough, NC 27278 <br />(919-732-4362) office (919-732-8660) Facsimile <br />www.warren-hay.com State License #7211 <br /> <br />July 19, 2023 <br /> <br /> <br />Orange County Public Works <br /> <br />Re: Jury Lounge WSHP unit <br /> <br />PROPOSAL <br /> <br /> We hereby submit specifications and estimates for: As noted: <br /> <br />• Provide & install (1) Water Source Heat Pump to replace existing Unit Model <br />#ESC70-3VTC Serial #RC107309. New Unit to sit back on existing stand and <br />reconnect to existing water piping, valves, power wiring, ductwork, drain and <br />control wiring. <br />• Secure required permits, inspections, start-up, and 1-year general warranty. <br /> <br />We propose hereby to furnish material and labor: $15,867.00. <br />Payment to be made upon completion. <br /> <br /> <br />Acceptance: _______________________ <br /> <br />Date: _________________________________ <br /> <br />Exclusions / Clarifications: <br /> <br />• Controls will reconnect to existing any modifications, updates or issues with controls would have to have <br />Siemens involved direct with Orange County. <br />• Concrete, roof, floor, cutting, patching, new by others. <br />• After hour, overtime premium labor, expedited shipment. Current lead time 8-12 weeks. <br />• Fire alarm apparatus, tie in, devices. <br /> <br /> <br /> <br /> <br />Respectfully submitted by: Ron LaPann Commercial Division ron.lapann@warren-hay.com Quote valid for 10 days. <br />DocuSign Envelope ID: 524C5EB6-E2CF-4EF7-A086-131014D52538
The URL can be used to link to this page
Your browser does not support the video tag.