Orange County NC Website
Revised 04/23 <br /> <br />NORTH CAROLINA <br />CONTRACT AMENDMENT <br />ORANGE COUNTY <br /> <br /> <br />THIS CONTRACT AMENDMENT (“Amendment”) is made and entered into this 2nd day of July 2023 by and between <br />ORANGE COUNTY (hereinafter referred to as “County”) and MBP Facility Solutions, LLC. (hereinafter referred to <br />as “Provider”). <br /> <br /> <br />WITNESSETH: <br /> <br />THAT WHEREAS, the County and Provider entered into a contract dated September 28, 2022, (hereinafter the “Original <br />Agreement”), for the provision of services for Retro-Commissioning Services for 510 Meadowlands Drive, Hillsborough <br />NC, 27278; and <br /> <br />WHEREAS, the County and Provider desire to amend the Original Agreement while keeping in effect all terms and <br />conditions of the Original Agreement not inconsistent with the terms and conditions set forth below. <br /> <br />NOW THEREFORE, for and in consideration of the mutual covenants and agreements made herein, the parties agree to <br />amend the Original Agreement as follows: <br /> <br />1. In order to ensure the completion of the Services identified in the term of the Original Agreement is amended <br />to reflect an end date by which all Services shall be completed of October 31, 2023. <br /> <br />2. Exhibit A to the Original Agreement is amended by adding the following tasks and services to the Services to <br />be provided by the Consultant: Provide additional services to verify the implementation of corrective actions <br />as recommended by MBP Carolinas, Inc., to prevent exhaust fumes from entering the building via the <br />dedicated outdoor air system intake during the operation of the building’s emergency power systems (diesel <br />generator). Additionally, MBP-FS will provide commissioning services to verify the operation of the Trane <br />units (supplemental) that have recently been connected to the building automation system (BAS) by <br />Siemens. MBP will subcontract with Absolute Glass Inc. and HPBS to complete the scope of work. The scope <br />of work for the project includes the removal of two windows on the northwest corner of the building (level <br />one) that have previously been subjected to testing by HPBS. MBP will update the Final Commissioning <br />Report to include the results of this inspection and recommendations for corrective actions if any defects <br />are identified. <br /> <br />1. Article 5, Section “a” is amended to reflect a maximum payable not-to-exceed amount of Sixty-Eight <br />Thousand, Five Hundred Dollars ($68,500.00). <br /> <br />2. Except for the changes made herein, the Original Agreement shall remain in full force and effect to the extent <br />it is not inconsistent with this Amendment. In the event there is a conflict between the terms of the Original <br />Agreement and the terms of this Amendment, this Amendment shall control. <br /> <br /> <br /> IN TESTIMONY WHEREOF, this Amendment has been executed by the parties hereto, as of the date first above <br />written. <br /> <br />ORANGE COUNTY PROVIDER <br /> <br />______________________________ __________________________________ <br />Bonnie Hammersley Kevin Day <br />County Manager President <br /> <br />DocuSign Envelope ID: EE84FF36-44AA-47C7-B0C6-25B3F5CB1704 <br />7/14/20237/21/2023