Orange County NC Website
equipment used, and a detailed input/output matrix or sequence of operations.In the event that such <br />information is provided post-award or such information is discovered by Siemens during installation of <br />the scope, a change order for additional time and an increase in cost may be required due to the <br />information differing from assumptions that Siemens had to make in developing the scope. <br />Page 7 of 11 <br />DocuSign Envelope ID: C25E8E2D-B104-4009-8866-5B7DB19D8361