Browse
Search
2023-312-E-AMS-Siemens Industry-Additional monitoring points
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-312-E-AMS-Siemens Industry-Additional monitoring points
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2023 10:55:00 AM
Creation date
7/17/2023 10:54:49 AM
Metadata
Fields
Template:
Contract
Date
7/7/2023
Contract Starting Date
7/7/2023
Contract Ending Date
7/13/2023
Contract Document Type
Contract
Amount
$18,677.15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exclusions <br />1.Offsite system monitoring fees <br />2.Cost associated with multiple trips to the job site due to incompletion by others <br />3.Working in areas containing hazardous materials or confined space <br />4.Cost associated with schedule acceleration or multiple unplanned phases <br />5.Telephone line for DACT and/or IP Network Connection <br />6.Costs associated with bypassing the system during construction <br />7.Building and construction permit fees <br />8.Creating base building auto cad drawings for the project <br />9.Ceiling and/or wall removal, replacement, patching, and painting <br />10.Per project aggregate general liability insurance <br />11.Overtime (except as specifically noted) <br />12.After hours work (except as specifically noted) <br />13.Additional testing due to others <br />14.Dedicated phone lines <br />15.Dedicated IP Network Drop <br />16.120 VAC power <br />17.Conduit raceway, Electrical boxes and supports <br />18.Performance or payment bonds <br />19.Bonding or special insurance <br />20.Fire caulking <br />21.Scaffolding and lifts (except as specifically noted) <br />22.Knox box <br />23.Shunt trip breakers <br />Clarifications <br />1.Siemens will be providing parts and smarts to the selected electrical contractor for this project. <br />2.Siemens will provide the fire alarm permit, review and inspection fees. <br />3.Siemens will need to be provided with architectural backgrounds in Auto CAD files, <br />4.approved fire protection report, and full set of construction documents, free of charge. <br />5.Siemens will provide monitoring points only. No installation of conduits, or of the devices or system to <br />be monitored. <br />6.All material and devices requested to be installed are an estimate given by customer. If the work to be <br />performed is larger than the scope of work described previously, a new change order will be needed. <br />7.Owner will need to allow Siemens full and complete access to the property for the duration of the <br />project. <br />8.All scheduling and phasing will need to have the Owner's input and will require the Owner's <br />cooperation to complete during the allotted time. <br />9.Submittals may take between 4-6 weeks for approval through the Fire Department. <br />10.All work to be performed during normal working hours of Monday thru Friday, 8:00am to 5:00pm. <br />11.If this proposal includes a Smoke Control/Smoke Management system, Siemens must be provided <br />Smoke Control/Smoke Management Drawings which define all Zone Boundaries, location, type of <br />Page 6 of 11 <br />DocuSign Envelope ID: C25E8E2D-B104-4009-8866-5B7DB19D8361
The URL can be used to link to this page
Your browser does not support the video tag.