Browse
Search
2023-306-E-DEAPR-Nature Trails NC-Repair and Rehab Bike Trails at Little River Regional Park
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-306-E-DEAPR-Nature Trails NC-Repair and Rehab Bike Trails at Little River Regional Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2023 10:51:17 AM
Creation date
7/17/2023 10:51:08 AM
Metadata
Fields
Template:
Contract
Date
7/12/2023
Contract Starting Date
7/12/2023
Contract Ending Date
7/13/2023
Contract Document Type
Contract
Amount
$45,116.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All wor k to be completed in a substantial wor kmanlike manner. Payments cannot be withheld for issues or delays outside this scope of wor k. Last payment is due after <br />substantial completion and final punch list. Any deviation from the above scope m ay become an extra char ge over and above this pr oposal. All agr eements contingent <br />upon accidents, weather, and/or delays beyond our contr ol. <br />Page 1 of 1 <br />Nature Trails <br />11312 U S 15 501 N St e 107185 <br />Chapel Hill, N C 27517 U S <br />inf o@nat uret rails nc.com <br />ww w .nat uret rails nc.com <br /> <br />Fee Pr opos al <br />ADDRESS <br />David Stanc il <br />O range County Department of Env ironment, Agric ulture, Park s and Rec reation (DEAPR) <br />PO Box 8181 (306-A Rev ere Road) <br />Hillsborough, NC 27278 <br />FEE PROPOSAL 1367 <br />DATE 11/04/2022 <br />ACTIVITY DESCRIPTION QTY RATE AMOUNT <br />Mobilization Mobilization of equipment 1 2,500.00 2,500.00 <br />Class 4 Trail (per linear ft)Add Beginner Jump Line (dirt only)865 12.00 10,380.00 <br />Class 4 Trail (per linear ft)Beginner Trail Rehab (dirt only)780 8.00 6,240.00 <br />Class 4 Trail (per linear ft)Intermediate Trail Rehab (dirt only)1,970 8.00 15,760.00 <br />Class 4 Trail (per linear ft)Advanced Trail Rehab (dirt only)920 8.00 7,360.00 <br />Cedar Launch Ramps Replace Take-Off Ramps for all jumps with <br />manufactured steel frame / cedar decked ramps. <br />18 1,500.00 27,000.00 <br />Signage Package Signage and Wayfinding at all features and critical <br />intersections. <br />1 5,000.00 5,000.00 <br />Notes & C onditions :TOTAL $74,240.00 <br />Acc epted By <br />Acc epted Date <br />DocuSign Envelope ID: 6193BB9A-F934-47D1-B0BB-CCFAB80E49B3
The URL can be used to link to this page
Your browser does not support the video tag.