Browse
Search
OTHER-2023-019 Professional Services Contract for Whitted Buildings HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Various Documents
>
2020 - 2029
>
2023
>
OTHER-2023-019 Professional Services Contract for Whitted Buildings HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2023 3:10:14 PM
Creation date
7/13/2023 3:00:45 PM
Metadata
Fields
Template:
BOCC
Date
3/21/2023
Meeting Type
Business
Document Type
Others
Agenda Item
8-d
Document Relationships
Agenda - 03-21-2023; 8-d - Professional Services Award for Whitted Buildings HVAC Replacement
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 03-21-2023 Business Meeting
Agenda for March 21, 2023 BOCC Meeting
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 03-21-2023 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:3D4D20DD-E384-4780-B168-B7B2CCA4B00B <br /> shall be obligated, without additional compensation,to adjust the design of the Project to assure that it remains within the approved <br /> Total Project Cost. <br /> 4.2.5 Should bidding or negotiation with contractors produce prices which,when added to the other elements of the approved Total <br /> Project Cost, produce a cost that is in excess of the approved Total Project Cost,the Designer shall participate with the Owner in <br /> negotiation and design adjustments to the extent such are necessary to obtain prices within the approved Total Project Cost. All activity <br /> of the Designer with respect to these matters shall constitute Basic Services and shall be performed by the Designer without additional <br /> compensation. If negotiation and design adjustments fail to bring costs within the Total Project Cost the Owner may reject all bids and <br /> Designer will redesign or reduce portions of the project in an effort to reduce the bid prices to within the Total Project Cost and rebid <br /> the project. All such redesign is included within Basic Services. If this second letting for bids does not produce bids that are within the <br /> approved Total Project Cost initially or after negotiations with the contractor, the Designer is not obligated to further redesign the <br /> Project. <br /> 4.3 Project Conferences <br /> 4.3.1 For the duration of the development of the Project,the Designer and its Consultants shall meet periodically with the Owner.The <br /> Designer shall meet with Owner as necessary to properly fulfill the requirements of this Agreement. The minimum regularly scheduled <br /> meetings which the Designer shall be required to attend are listed below: <br /> Site Visits required to complete the design <br /> PreBid Meeting <br /> PreConstruction Conference <br /> Site Visits during construction, including final inspections <br /> 4.4 Construction Administration <br /> 4.4.1 As part of Basic Services,the Designer shall provide all of the mutually agreed administrative services described in the Owner's <br /> contracts with the contractors for the Project. <br /> ARTICLE 5 <br /> ADDITIONAL SERVICES <br /> 5.1 Compensation is due for Additional Services that are not otherwise included in Basic Services (Attachment B) provided by the <br /> Designer or its Consultants only when the Owner requests such Additional Services in writing and after both Owner and Designer agree <br /> to the terms of providing such Additional Services through an amendment to this Agreement. <br /> 5.1.1 Designer or its Consultants shall provide fully detailed presentation models or professional artist's renderings at the written <br /> direction and approval of the Owner, if such services are not included in Basic Services Attachment B. <br /> 5.1.2 Designer or its Consultants shall make all necessary revisions in drawings, specifications, or other documents when the drawings, <br /> specifications, or other documents are inconsistent with written approvals or instructions previously given by the Owner. <br /> 5 <br /> Revised 06/21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.