Browse
Search
OTHER-2023-019 Professional Services Contract for Whitted Buildings HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Various Documents
>
2020 - 2029
>
2023
>
OTHER-2023-019 Professional Services Contract for Whitted Buildings HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2023 3:10:14 PM
Creation date
7/13/2023 3:00:45 PM
Metadata
Fields
Template:
BOCC
Date
3/21/2023
Meeting Type
Business
Document Type
Others
Agenda Item
8-d
Document Relationships
Agenda - 03-21-2023; 8-d - Professional Services Award for Whitted Buildings HVAC Replacement
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 03-21-2023 Business Meeting
Agenda for March 21, 2023 BOCC Meeting
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 03-21-2023 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:3D4D20DD-E384-4780-B168-B7B2CCA4B00B <br /> 12.9 Electronic Signatures <br /> 12.9.1 This Agreement together with any amendments or modifications may be executed electronically. All electronic signatures <br /> affixed hereto evidence the intent of the Parties to comply with Article 11A and Article 40 of North Carolina General Statute Chapter 66. <br /> 12.10 Iran Divestment and Israel Boycott <br /> 12.10.1 Designer certifies that, as of the date listed below, it is not on the Final Divestment List as created by the State Treasurer <br /> pursuant to N.C.G.S. § 147-86.58 or the final boycott list created by the State Treasurer pursuant to N.C.G.S. §147-86.81 nor shall <br /> Designer utilize in the performance of this Agreement any subcontultant or consultant identified on such lists. <br /> 12.11 List of Attachment and Referenced Documents and Priority <br /> 12.11.1 The design documents consist of this Agreement and the attached and referenced documents. The attachment and referenced <br /> documents are listed in this Section 12.11.1 and are incorporated herein and made part of this Agreement by reference. In the event of <br /> any inconsistency between or among the terms of this Agreement and any of the incorporated listed documents such inconsistency or <br /> conflict shall be interpreted in the following order of priority: <br /> This Agreement <br /> Attachment A- Description of the Project <br /> Attachment B- Description of Basic Services <br /> Attachment C- Format of Total Project Cost Estimate(s) <br /> Attachment D- Key Milestone Listing <br /> Attachment E-Consultants and Key Personnel <br /> Attachment F- Hourly Rates Schedule <br /> Request for Qualifications <br /> Statement of qualifications <br /> IN WITNESS WHEREOF, the Parties hereto have executed this Agreement as of the day and date first above written in a number <br /> of counterparts, each of which shall, without proof or accounting for other counterparts, be deemed an original contract. <br /> ORANGE COUNTY: DESIGNER: <br /> By:C�a `� 3/28/2023 Sfwepb 3/27/2023 <br /> o�es,a uEa w `" By: <br /> Bonnie Hammersley, County Manager Steve Campbell, <br /> Printed Name and Title Printed Name and Title <br /> Progressive Design Collaboration, Ltd. <br /> 3101 Poplarwood Court <br /> Suite 320 <br /> Raleigh, NC 2764 <br /> 15 <br /> Revised 06/21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.