Browse
Search
Agenda - 03-04-2004-8c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 03-04-2004
>
Agenda - 03-04-2004-8c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:32:56 AM
Creation date
8/29/2008 10:38:45 AM
Metadata
Fields
Template:
BOCC
Date
3/4/2004
Document Type
Agenda
Agenda Item
8c
Document Relationships
2004 NS Housing - Silver Fox Enterprises Housing Rehabilitation Contract Award
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2004
Minutes - 20040304
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Katrina Alston <br />420 Northside Dr. <br />Chapel Hill <br />493-6664 <br />1 /14/04 <br />Exterior: <br />1. Install aluminum, continuous gutters and downspouts. Install plastic <br />splash-blocks under each downspout. <br />2. Replace the left/front corner trim on the fascia. <br />3. Install scrawl-space door of 3/4 inch plywood on a pressure treated frame <br />with galvanized hinges and a locking hasp. <br />4. Pressure wash the siding on the right side of the house. <br />w <br />5, Install vinyl soffitt with ventilated panels every four feet. Install aluminum <br />fascia, window and door trim. <br />6, Remove junk car. <br />7. Seal the gap between the concrete and the siding at the rear door with <br />silicone caulk. ..~._ <br />8, Replace the exterior storeroom door with a six panel, metal insulated door <br />unit, with weather-stripping, aluminum threshold and lockset to be keyed <br />iiic Same ~o ih6 i'6ai uuur, <br />Roof: <br />1, Remove two courses of shingles on the left/rear gable. Install matching <br />shingles, <br />2, Install aluminum drip edge. <br />3, Install a shingle type ridge vent and matching shingles. <br />4. Cut the front/left side gable shingles. <br />5, Replace three plumbing boots. <br />9 <br />6, Remove the damaged caulk on the chimney and install new caulk, <br />
The URL can be used to link to this page
Your browser does not support the video tag.