Browse
Search
2023-244-E-AMS-CT Wilson Construction-CSA ad exterior lights at CSA per NCDOL inspection
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-244-E-AMS-CT Wilson Construction-CSA ad exterior lights at CSA per NCDOL inspection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2023 10:07:59 AM
Creation date
6/7/2023 10:07:46 AM
Metadata
Fields
Template:
Contract
Date
5/25/2023
Contract Starting Date
5/25/2023
Contract Ending Date
5/30/2023
Contract Document Type
Contract
Amount
$6,368.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C.T. Wilson Construction <br />150 Golden Drive Suite 200 <br />Durham, North Carolina 27705 <br />Phone: +1 (919) 383-2535 <br />Project: 211-643 - Orange County Facility Reno <br />106 E Margaret, 109 Court St, and 300 W Tryon <br />Hillsborough, North Carolina 27278 <br />Prime Contract Potential Change Order #45: CSA Add Fixtures per DOL <br />TO: Orange County <br />P.O. Box 8181 <br />Hillsborough, North Carolina 27278 <br />FROM: C.T. Wilson Construction Co., <br />150 Golden Dr Suite 200 <br />Durham, North Carolina 27705 <br />PCO NUMBER/REVISION: 45 / 1 CONTRACT:2 - Misc Work <br />REQUEST RECEIVED FROM: CREATED BY: Tarah Hackney (C.T. Wilson <br />Construction Co.,) <br />STATUS: Pending - In Review CREATED DATE: 2/1/2023 <br />REFERENCE: PRIME CONTRACT <br />CHANGE ORDER: <br />#001 - (no title) <br />FIELD CHANGE: No <br />LOCATION: ACCOUNTING METHOD: Amount Based <br />SCHEDULE IMPACT: PAID IN FULL: No <br />EXECUTED:No SIGNED CHANGE ORDER <br />RECEIVED DATE: <br /> TOTAL AMOUNT: $6,367.76 <br /> <br />POTENTIAL CHANGE ORDER TITLE: CSA Add Fixtures per DOL <br /> <br />CHANGE REASON: Design Development <br /> <br />POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) <br />CE #051 - CSA Add Fixtures per DOL Inspection of Lift <br />Install fixtures to illuminate the top and bottom landings per DOL inspection July 2022 <br />Reinspection fee to Romar Elevator <br /> <br />ATTACHMENTS: <br />Romar Reinspection Fee.pdf , CSA DOL Inspection Report.pdf , HBE COR 13R1 HC Lift Fixtures.pdf , PR-004_ADA Lift Fixtures.pdf <br /> <br />#Budget Code Description Amount <br />1 26-0010.SUB Electrical - General.Subcontract Add 3 fixtures and necessary conduit/wire $4,760.00 <br />2 14-4000.SUB Lifts.Subcontract Reinspection Fee $1,200.00 <br />Subtotal:$5,960.00 <br />Labor Burden (42.00% Applies to Overtime hours and Regular Hours.):$0.00 <br />AGC Fees (0.10% Applies to Overtime hours, Burden, Other, Equipment Cost, Material, Regular Hours, Overhead, and <br />Subcontract.):$5.96 <br />Builders Risk Insurance (0.15% Applies to Overtime hours, Burden, Other, Equipment Cost, Material, Regular Hours, Overhead, and <br />Subcontract.):$8.95 <br />Bond (1.50% Applies to Overtime hours, Burden, Other, Equipment Cost, Material, Regular Hours, Overhead, and Subcontract.):$89.62 <br />OH&P Self-Performed (10.00% Applies to Overtime hours, Burden, Other, Equipment Cost, Material, Regular Hours, and Overhead.) <br />:$0.00 <br />OH&P Subcontracted Work (5.00% Applies to Subcontract.):$303.23 <br />Grand Total:$6,367.76 <br /> <br />C.T. Wilson Construction Page 1 of 2 Printed On: 5/12/2023 08:33 AM <br /> <br /> <br /> <br />PCO #45 <br /> <br />DocuSign Envelope ID: 6934F811-8A97-4DC4-921D-C22430373D2F
The URL can be used to link to this page
Your browser does not support the video tag.