Browse
Search
Agenda - 06-06-2023; 5-b - Zoning Atlas Amendment MA22-0004 – Parcel Located off Lawrence Road and US 70A, in Eno Township
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 06-06-2023 Business Meeting
>
Agenda - 06-06-2023; 5-b - Zoning Atlas Amendment MA22-0004 – Parcel Located off Lawrence Road and US 70A, in Eno Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2023 3:30:24 PM
Creation date
6/1/2023 3:40:16 PM
Metadata
Fields
Template:
BOCC
Date
6/6/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-b
Document Relationships
Agenda for June 6, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 06-06-2023 Business Meeting
Minutes-06-06-2023-Business Meeting Con'd
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2023
OTHER-2023-036-Statement of Inconsistency of a Proposed Zoning Atlas Map Amendment with the Adopted Orange County 2030 Comprehensive Plan and Other Applicable Adopted Plans
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-037-Contract Amendment – Recreation Factory Partners, Inc. (Sportsplex)
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-038-Application for amendments to the joint planning land use plan future land use map and zoning atlas 2016 Mount Carmel Church road within the Chapel Hill Township
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-039-Revised Memorandum of Understanding (MOU) for the Orange County
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-040-Offer Letter-Hurricane Florence Hazard Mitigation Property Acquisition Authorization
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
PRO-2023-010-Proclamation recognizing Juneteeth 2023
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2023
RES-2023-041-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-042-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-043-Opioid advisory committee settlement use recommendation and approval budget amendment 10-B
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-044-Request to Abandon Future Street at Acorn Ridge Trail
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-045-RESOLUTION AUTHORIZING THE CHAIR TO EXECUTE A REVISED MEMORANDUM OF UNDERSTANDING WITH THE ORANGE COUNTY PARTNERSHIP TO END HOMELESSNESS
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-047-Resolution Approving Leases for Mobile Classroom Units for 2023-24 School Year
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
49 <br /> WSC <br /> WOOD SOIL 620 Lee Fox Lane <br /> Hillsborough NC 27278 <br /> CONSULTANTS (919)417-8027 <br /> March 28, 2023 <br /> Jim Parker <br /> Summit <br /> 320 Executive Court <br /> Hillsborough, NC 27278 <br /> Subject: Lawrence Road Development <br /> Dear Jim: <br /> As you are aware, we performed a Reconnaissance Soil & Site Evaluation of the Subject property <br /> and presented our findings in a report dated November 21, 2021. Based upon the findings in that <br /> report, we considered the site's ability to accommodate an on-site subsurface wastewater system <br /> for a day school with a daily wastewater requirement of 12,000 gallons per day (GPD). Assuming <br /> the septic drainfield would be placed in an area that had soils that were classed as Provisionally <br /> Suitable for Conventional Type systems and assigned a long-term acceptance rate (LTAR) of 0.25 <br /> GPD/ft2, we note the following: <br /> When determining the area needed for the drainfield, the following equation is used to first <br /> determine the amount of drainline: <br /> Drainline = School GPD/ LTAR/3' trench width <br /> 16,000 If= 12,000/0.25/3 <br /> Once the amount of drainline is determined, the area needed for the drainfield is calculated as <br /> follows: <br /> Area = drainline x 9-foot center spacing x buffer x repair system <br /> 345,600 ft2 = 16,000 x 9 x 1.2 x repair system <br /> The area calculation is based on the following assumptions: <br /> • 20% buffer is factored in to allot for diverging drainline and other site factors <br /> • Repair system is using the same drainfield type and parameters as the initial system <br /> As such, 345,600 ft2 or approximately 8.00 acres will be required for the initial and repair systems. <br /> Based on the provided layout of the site, there appears to be a minimum of 8.00 acres that are <br /> available for the drainfield within the area noted to have predominantly soil Provisionally Suitable <br /> for Conventional Type systems. <br /> Sincerely, <br /> W 6- , <br /> Michael G. Wood, LSS <br />
The URL can be used to link to this page
Your browser does not support the video tag.