Orange County NC Website
160 <br /> minutes, therefore no overlap of peak periods between the two schools was assumed and <br /> that the recreational area was not expected to generate significant trips during the school <br /> peak periods. The TIA accounted for these conditions in the analysis scenarios. If the <br /> school is projected to accommodate a higher number of students or other changed <br /> conditions such as altered bell schedules, then further review will be required. It is the <br /> responsibility of the school to maintain their school generated traffic on their campus. <br /> Required Improvements by the Applicant: <br /> Pursuant to NCGS 136-18(29a) and 19A NCAC 02C.0116, and as a condition of the <br /> pending NCDOT Driveway Permit, the Applicant will need to construct the following <br /> internal and external improvements determined by NCDOT as necessary and required to <br /> adequately mitigate the traffic impacts and ensure acceptable traffic operation at the site <br /> accesses attributable to the new school. <br /> External to Site: <br /> U.S. 70A and Proposed Site Access <br /> • Construct an exclusive westbound left turn lane on U.S. 70A with a minimum of <br /> 150' of full storage and appropriate transitions per NCDOT requirements. <br /> Lawrence Road and Proposed Site Access <br /> • Construct an exclusive southbound left turn lane on Lawrence Road with a <br /> minimum of 150' of full storage and appropriate transitions per NCDOT <br /> requirements <br /> Eligible costs for engineering, design, right of way, utilities, and construction of these <br /> external improvements incurred by the school are reimbursable by NCDOT. It will be <br /> necessary for the school system to consult with the District Engineer on necessary <br /> administrative procedures as established by 19A NCAC 02C.0116. <br /> Internal to Site: <br /> • Construct access at Lawrence Road with stop control and one ingress lane and two <br /> egress lanes consisting of an exclusive left turn lane with a minimum of 250' of <br /> full storage and an exclusive right turn lane with a minimum of 200' of full <br /> storage. Provide a minimum 250' internal protected stem along the access. <br /> • Construct access at U.S. 70A with stop control and one ingress lane and two <br /> egress lanes consisting of an exclusive left turn lane with a minimum of 525' of <br /> full storage and an exclusive right turn lane with a minimum of 350' of full <br /> storage. Provide a minimum 525' internal protected stem along the access. <br /> • Configure the site to accommodate anticipated high demand internal queues of <br /> 4414' for the K-8 school and 2751' for the 9-12 high school. <br />