Browse
Search
Agenda - 06-06-2023; 5-b - Zoning Atlas Amendment MA22-0004 – Parcel Located off Lawrence Road and US 70A, in Eno Township
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 06-06-2023 Business Meeting
>
Agenda - 06-06-2023; 5-b - Zoning Atlas Amendment MA22-0004 – Parcel Located off Lawrence Road and US 70A, in Eno Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2023 3:30:24 PM
Creation date
6/1/2023 3:40:16 PM
Metadata
Fields
Template:
BOCC
Date
6/6/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-b
Document Relationships
Agenda for June 6, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 06-06-2023 Business Meeting
Minutes-06-06-2023-Business Meeting Con'd
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2023
OTHER-2023-036-Statement of Inconsistency of a Proposed Zoning Atlas Map Amendment with the Adopted Orange County 2030 Comprehensive Plan and Other Applicable Adopted Plans
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-037-Contract Amendment – Recreation Factory Partners, Inc. (Sportsplex)
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-038-Application for amendments to the joint planning land use plan future land use map and zoning atlas 2016 Mount Carmel Church road within the Chapel Hill Township
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-039-Revised Memorandum of Understanding (MOU) for the Orange County
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-040-Offer Letter-Hurricane Florence Hazard Mitigation Property Acquisition Authorization
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
PRO-2023-010-Proclamation recognizing Juneteeth 2023
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2023
RES-2023-041-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-042-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-043-Opioid advisory committee settlement use recommendation and approval budget amendment 10-B
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-044-Request to Abandon Future Street at Acorn Ridge Trail
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-045-RESOLUTION AUTHORIZING THE CHAIR TO EXECUTE A REVISED MEMORANDUM OF UNDERSTANDING WITH THE ORANGE COUNTY PARTNERSHIP TO END HOMELESSNESS
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-047-Resolution Approving Leases for Mobile Classroom Units for 2023-24 School Year
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State of North Carolina Department of Environmental Quality 149 <br /> INTERGOVERNMENTAL REVIEW PROJECT COMMENTS <br /> Reviewing Regional Office: Raleigh <br /> Project Number: 23-0109 Due Date: 1/9/2023 <br /> County: Orange <br /> Normal Process <br /> PERMITS SPECIAL APPLICATION PROCEDURES or REQUIREMENTS Time <br /> (Statutory time <br /> limit) <br /> On-site inspection usual.Surety bond filed with DEQ Bond amount <br /> ❑ <br /> varies with type mine and number of acres of affected land.Affected 30 days Mining Permit area greater than one acre must be permitted.The appropriate bond (60 days) <br /> must be received before the permit can be issued. <br /> If permit required,application 60 days before begin construction. <br /> Applicant must hire N.C.qualified engineer to prepare plans,inspect <br /> construction,and certify construction is according to DEQ approved <br /> ❑ Dam Safety Permit <br /> plans.May also require a permit under mosquito control program.And 30 days <br /> a 404 permit from Corps of Engineers.An inspection of site is necessary (60 days) <br /> to verify Hazard Classification. A minimum fee of$200.00 must <br /> accompany the application.An additional processing fee based on a <br /> percentage,or the total project cost will be required upon completion. <br /> ❑ Oil Refining Facilities N/A 90-120 days <br /> (N/A) <br /> File surety bond of$5,000 with DEQ running to State of NC conditional 10 days <br /> ❑ Permit to drill exploratory oil or gas well that any well opened by drill operator shall,upon abandonment,be N/A <br /> plugged according to DEQ rules and regulations. <br /> ❑ <br /> Application filed with DEQ at least 10 days prior to issue of permit. 10 days Geophysical Exploration Permit Application by letter.No standard application forms. N/A <br /> Application fee based on structure size is charged.Must include <br /> 15-20 days <br /> ❑ State Lakes Construction Permit descriptions&drawings of structure&proof of ownership of riparian N/A <br /> property <br /> Compliance with the T15A 02H.0500 Certifications are required 60 days <br /> ® 401 Water Quality Certification whenever construction or operation of facilities will result in a (130 days) <br /> discharge into navigable water as described in 33 CFR part 323. <br /> Compliance with Catawba,Goose Creek,Jordan Lake,Randleman,Tar Pamlico or Neuse Riparian Buffer Rules is required.Buffer requirements: <br /> ® http:/Ideg.nc.gov/`about/divisions/water-resources/water-resources-permits/wastewater-branch/401-wetlands-buffer-permits/401-riparian- <br /> buffer-protection-program <br /> Nutrient Offset:Loading requirements for nitrogen and phosphorus in the Neuse and Tar-Pamlico River basins,and in the Jordan and Falls Lake <br /> ❑ watersheds,as part of the nutrient-management strategies in these areas. DWR nutrient offset information: <br /> http://deg.nc.gov/about/divisions/water-resources/planning/nonpoint-source-management/nutrient-offset-information <br /> ❑ CAMA Permit for MAJOR development $250.00-$475.00 fee must accompany application 75 days <br /> (150 days) <br /> ❑ CAMA Permit for MINOR development $100.00 fee must accompany application 22 days(25 days) <br /> ❑ Abandonment of any wells,if required must be in accordance with Title 15A.Subchapter 2C.0100. <br /> ® Notification of the proper regional office is requested if"orphan"underground storage tanks(USTS)are discovered during any excavation <br /> operation. <br /> Plans and specifications for the construction,expansion,or alteration of a public water system must be approved by the <br /> Division of Water Resources/Public Water Supply Section prior to the award of a contract or the initiation of construction <br /> ® as per 15A NCAC 18C.0300 et.seq.,Plans and specifications should be submitted to 1634 Mail Service Center,Raleigh, 30 days <br /> North Carolina 27699-1634. All public water supply systems must comply with state and federal drinking water monitoring <br /> requirements.For more information,contact the Public Water Supply Section,(919)707-9100. <br /> If existing water lines will be relocated during the construction,plans for the water line relocation must be submitted to <br /> ® the Division of Water Resources/Public Water Supply Section at 1634 Mail Service Center,Raleigh,North Carolina 27699- 30 days <br /> 1634.For more information,contact the Public Water Supply Section,(919)707-9100. <br /> Plans and specifications for the construction,expansion,or alteration of the water system must be approved through the delegated <br /> ❑ plan approval authority. Please contact them at for further information. <br /> DEQ INTERGOVERNMENTAL REVIEW PROJECT Form Page 2 of 3 <br /> April 4,2022/lbh <br />
The URL can be used to link to this page
Your browser does not support the video tag.