Browse
Search
Agenda - 06-06-2023; 5-b - Zoning Atlas Amendment MA22-0004 – Parcel Located off Lawrence Road and US 70A, in Eno Township
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 06-06-2023 Business Meeting
>
Agenda - 06-06-2023; 5-b - Zoning Atlas Amendment MA22-0004 – Parcel Located off Lawrence Road and US 70A, in Eno Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2023 3:30:24 PM
Creation date
6/1/2023 3:40:16 PM
Metadata
Fields
Template:
BOCC
Date
6/6/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-b
Document Relationships
Agenda for June 6, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 06-06-2023 Business Meeting
Minutes-06-06-2023-Business Meeting Con'd
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2023
OTHER-2023-036-Statement of Inconsistency of a Proposed Zoning Atlas Map Amendment with the Adopted Orange County 2030 Comprehensive Plan and Other Applicable Adopted Plans
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-037-Contract Amendment – Recreation Factory Partners, Inc. (Sportsplex)
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-038-Application for amendments to the joint planning land use plan future land use map and zoning atlas 2016 Mount Carmel Church road within the Chapel Hill Township
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-039-Revised Memorandum of Understanding (MOU) for the Orange County
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-040-Offer Letter-Hurricane Florence Hazard Mitigation Property Acquisition Authorization
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
PRO-2023-010-Proclamation recognizing Juneteeth 2023
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2023
RES-2023-041-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-042-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-043-Opioid advisory committee settlement use recommendation and approval budget amendment 10-B
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-044-Request to Abandon Future Street at Acorn Ridge Trail
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-045-RESOLUTION AUTHORIZING THE CHAIR TO EXECUTE A REVISED MEMORANDUM OF UNDERSTANDING WITH THE ORANGE COUNTY PARTNERSHIP TO END HOMELESSNESS
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-047-Resolution Approving Leases for Mobile Classroom Units for 2023-24 School Year
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State of North Carolina Department of Environmental Quality 148 <br /> INTERGOVERNMENTAL REVIEW PROJECT COMMENTS <br /> Reviewing Regional Office: Raleigh <br /> Project Number: 23-0109 Due Date:1/9/2023 <br /> County: Orange <br /> After review of this project,it has been determined that the DEQ permit(s)and/or approvals indicated may need to be obtained for this project to <br /> comply with North Carolina Law.Questions regarding these permits should be addressed to the Regional Office indicated on the reverse of the <br /> form.All applications,information and guidelines relative to these plans and permits are available from the same Regional Office. <br /> Normal Process <br /> PERMITS SPECIAL APPLICATION PROCEDURES or REQUIREMENTS Time <br /> (Statutory time <br /> limit) <br /> Permit to construct&operate wastewater Application 90 days before begins construction or award of <br /> treatment facilities,non-standard sewer system❑ 30 days extensions&sewer systems that do not construction contracts.On-site inspection may be required.Post- (90 days) <br /> discharge into state surface waters. application technical conference usual. <br /> Permit to construct&operate,sewer <br /> extensions involving gravity sewers,pump Fast-Track Permitting program consists of the submittal of an 30 days <br /> ❑ stations and force mains discharging into a application and an engineer's certification that the project meets all (N/A) <br /> sewer collection applicable State rules and Division Minimum Design Criteria. <br /> system <br /> NPDES-permit to discharge into surface water Application 180 days before begins activity.On-site inspection.Pre- <br /> and/or permit to operate and construct application conference usual.Additionally,obtain permit to construct 90-120 days <br /> wastewater facilities discharging into state wastewater treatment facility granted after NPDES.Reply time,30 days (N/A) <br /> surface waters. after receipt of plans or issue of NPDES permit-whichever is later. <br /> El Water days Water Use Permit Pre-application technical conference usually necessary. (N/A) <br /> Complete application must be received,and permit issued prior to the <br /> ❑ <br /> installation of a groundwater monitoring well located on property not 7 days Well Construction Permit owned by the applicant,and for a large capacity(>100,000 gallons per (15 days) <br /> ) <br /> day)water supply well. <br /> Application copy must be served on each adjacent riparian property <br /> ❑ <br /> owner.On-site inspection.Pre-application conference usual.Filling may 55 days Dredge and Fill Permit require Easement to Fill from N.C.Department of Administration and (90 days) <br /> Federal Dredge and Fill Permit. <br /> Permit to construct&operate Air Pollution Application must be submitted,and permit received prior to <br /> ❑ <br /> construction and operation of the source. If a permit is required Abatement facilities and/or Emission Sources as in an area without local zoning,then there are additional 90 days <br /> per 15 A NCAC(2Q.0100 thru 2Q.0300) requirements and timelines(2Q.0113). <br /> Any open burning associated with subject <br /> ® proposal must be in compliance with 15 A NCAC N/A 60 days <br /> (90 days) <br /> 2D.1900 <br /> Demolition or renovations of structures Please Note-The Health Hazards Control Unit(HHCU)of the N.C. <br /> containing asbestos material must be in Department of Health and Human Services,must be notified of plans to <br /> ® compliance with 15 A NCAC 20.1110(a)(1) demolish a building,including residences for commercial or industrial 60 days <br /> which requires notification and removal prior to expansion,even if no asbestos is present in the building. (90 days) <br /> demolition.Contact Asbestos Control Group <br /> 919-707-5950 <br /> The Sedimentation Pollution Control Act of 1973 must be properly addressed for any land disturbing activity.An erosion& <br /> sedimentation control plan will be required if one or more acres are to be disturbed.Plan must be filed with and approved 20 days <br /> ® by applicable Regional Office(Land Quality Section)at least 30 days before beginning activity. A NPDES Construction <br /> Stormwater permit(NCG010000)is also usually issued should design features meet minimum requirements. A fee of (30 days) <br /> $100 for the first acre or any part of an acre. An express review option is available with additional fees. <br /> Sedimentation and erosion control must be addressed in accordance with NCDOT's approved program. Particular (30 days) <br /> ❑ attention should be given to design and installation of appropriate perimeter sediment trapping devices as well as stable <br /> Stormwater conveyances and outlets. <br /> Sedimentation and erosion control must be addressed in accordance with Local Government's approved program. <br /> Based on Local <br /> ❑ Particular attention should be given to design and installation of appropriate perimeter sediment trapping devices as well <br /> as stable Stormwater conveyances and outlets. Program <br /> ❑ Compliance with 15A NCAC 04B.0125—Buffers Zones for Trout Waters shall have an undisturbed buffer zone 25 feet wide or of sufficient width <br /> to confine visible siltation within the twenty-five percent(25%)of the buffer zone nearest the land-disturbing activity,whichever is greater. <br /> ❑ Compliance with 15A NCAC 2H.0126-NPDES Stormwater Program which regulates three types of activities:Industrial, 30-60 days <br /> Municipal Separate Storm Sewer System&Construction activities that disturb>_1 acre. (90 days) <br /> Compliance with 15A NCAC 2H 1000-State Stormwater Permitting Programs regulate site development and post- 45 days <br /> ❑ construction stormwater runoff control. Areas subject to these permit programs include all 20 coastal counties,and (90 days) <br /> various other counties and watersheds throughout the state. <br /> DEQ INTERGOVERNMENTAL REVIEW PROJECT Form Page 1 of 3 <br /> April 4,2022/lbh <br />
The URL can be used to link to this page
Your browser does not support the video tag.