Browse
Search
Agenda - 06-06-2023; 8-a - Minutes
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2023
>
Agenda - 06-06-2023 Business Meeting
>
Agenda - 06-06-2023; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2023 3:34:09 PM
Creation date
6/1/2023 3:09:04 PM
Metadata
Fields
Template:
BOCC
Date
6/6/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda for June 6, 2023 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2023\Agenda - 06-06-2023 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> 1 Chair Bedford asked what is causing the bubbling. <br /> 2 Steven Arndt, Asset Management Services Director said the slab was not adequately <br /> 3 sealed when the original floor was placed, so moisture has come up causing bubbling. He said <br /> 4 they will seal the floor properly during the replacement. <br /> 5 Vice-Chair McKee asked if the sewer lines still run under the building. <br /> 6 Steve Arndt said no. <br /> 7 Vice-Chair McKee asked if they have looked at other options besides vinyl because <br /> 8 gymnasium floors are usually wooden. <br /> 9 Steve Arndt said some grade schools use this composite flooring. <br /> 10 Vice-Chair McKee said this is a problem that can sometimes come back after repairs. <br /> 11 Travis Myren said staff will look at different floor covering options. <br /> 12 Chair Bedford said this type of composite flooring helps protect children's teeth. <br /> 13 Commissioner Portie-Ascott asked how the quote process works. <br /> 14 Steve Arndt said they will follow the standard bid process and that this is an estimate. <br /> 15 Travis Myren said many of the numbers here are estimates based on talking with <br /> 16 vendors and the bid process will be done later according to statutes. <br /> 17 <br /> 18 Slide #15 <br /> FY2023-33 Recommended Capital Investment Plan <br /> {Climate Charge Mitigation <br /> $554,085 (p. 38) <br /> - Dedicated 'P#cent property tax rate <br /> - of funds through competitive grant <br /> - 50% of funds available to schools <br /> 4P <br /> ORANGE COUNTY <br /> N4DRYI L CA R07-1 NA <br /> 19 'y <br /> 20 <br /> 21 <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.