Browse
Search
Agenda - 06-06-2023; 5-b - Zoning Atlas Amendment MA22-0004 – Parcel Located off Lawrence Road and US 70A, in Eno Township
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2023
>
Agenda - 06-06-2023 Business Meeting
>
Agenda - 06-06-2023; 5-b - Zoning Atlas Amendment MA22-0004 – Parcel Located off Lawrence Road and US 70A, in Eno Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2023 3:30:24 PM
Creation date
6/1/2023 3:03:53 PM
Metadata
Fields
Template:
BOCC
Date
6/6/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-b
Document Relationships
Agenda for June 6, 2023 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2023\Agenda - 06-06-2023 Business Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
33 <br /> C. Will the project involve a land application system for treatment of wastewater? <br /> ■ ❑ Yes 8 No - If yes, describe <br /> ■ Has an application for a non-discharge permit been submitted to the NC <br /> Department of Environmental Management or Orange County Department of <br /> Environmental Health? ❑ Yes ❑ No <br /> D. Is a septic tank system proposed which has a design capacity of more than <br /> 3,000 gallons per day? <br /> ❑ Yes 8 No - If yes, describe TBD following updated design information <br /> E. Does the activity involve sludge disposal? ❑ Yes 8 No <br /> ■ If yes, where is the source of the sludge? <br /> ■ Describe where and how the sludge is being disposed <br /> ■ Has a NPDES permit from the NC Division of Environmental Quality been issued? <br /> ❑ Yes ❑ No <br /> F. Water Usage <br /> ■ Estimated number of employees: x 25 gallons per day (gpd) = gpd <br /> ■ Estimated water use for climate control = gpd <br /> ■ Process Water <br /> % Consumed <br /> • Discharged to septic system <br /> • Discharged to surface (including storm sewers) - Describe: <br /> % Evaporated <br /> % Reclaimed/reused <br /> % Other <br /> = 100% <br /> ■ Water used for cooling, heating, etc., in association with production or manufacturing <br /> % Reused <br /> % Consumed <br /> % Discharged - Describe: <br /> = 100% <br /> See below gpd Total Water Usage <br /> ■ Describe source of water: Municipal water and sewer are expected for school buildings. <br /> Specific water usage calculations are not possible at this stage of preliminary designs. <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.