Browse
Search
2023-217-E-AMS-F A Jenkins Construction-Misc Office Renovations in Tax Office
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-217-E-AMS-F A Jenkins Construction-Misc Office Renovations in Tax Office
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2023 8:11:39 AM
Creation date
5/24/2023 8:11:25 AM
Metadata
Fields
Template:
Contract
Date
5/11/2023
Contract Starting Date
5/11/2023
Contract Ending Date
5/15/2023
Contract Document Type
Contract
Amount
$10,410.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F A Jenkins Construction, Inc <br />402 Avalon Dr <br />Mebane, NC 27302 <br />Office (336) 260-1001 <br />Mjenkins31@triad.rr.com <br /> <br />DATE: MAY 8, 2023 <br /> <br /> TO: Alan Dorman, Allison Cooper <br />Orange County Asset <br />Management Services <br />adorman@orangecountync.gov <br />acooper@orangecountync.gov <br /> <br /> <br />JOB <br />Misc. office renovations <br /> <br />ITEM # DESCRIPTION QUANTITY <br /> <br />Provide and Install 3 5/8” metal studs, 5/8” drywall (hang & finish), paint wall, <br />install vinyl base for new (approx.) 5’ long wall, 9’ high ( to bottom of existing <br />ceiling) and install new 3’ x 7’ solid core wood door and metal frame. <br />$5,855.00 <br /> <br /> <br />Demo existing wall and ceiling, demo existing flooring as needed and prep floor <br />to receive new glue down LVP flooring. Patch walls where existing wall was <br />removed and prep for painting. Provide and install new ceiling tile and grid. <br />Install new flooring and vinyl base. Paint walls. <br />$10,785.00 <br /> <br /> <br />Demo (approx.) 20’ existing counter/work top, patch wall as needed and prep <br />wall for paint. Provide and Install 3 5/8” metal studs, 5/8” drywall (hang & <br />finish), install vinyl base for new (approx.) 9’-6” long wall, and install new 3’ x 7’ <br />solid core wood door and metal frame. Re-work existing ceiling as needed. Paint <br />walls <br />$10,410.00 <br /> <br /> <br /> <br /> Total >>>>>> <br /> <br />Thank you for your business! <br /> PROPOSAL <br />DocuSign Envelope ID: 33B2124F-812F-458B-9EDE-71FBA7C876DE
The URL can be used to link to this page
Your browser does not support the video tag.