Browse
Search
Agenda 05-16-2023; 8-e - Schools Adequate Public Facilities Ordinance – Approval and Certification of 2023 Report
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 05-16-2023 Business Meeting
>
Agenda 05-16-2023; 8-e - Schools Adequate Public Facilities Ordinance – Approval and Certification of 2023 Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2023 4:02:45 PM
Creation date
5/11/2023 4:08:27 PM
Metadata
Fields
Template:
BOCC
Date
5/16/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-e
Document Relationships
Agenda for May 16, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 05-16-2023 Business Meeting
Minutes-04-04-2023-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2023
Minutes-05-16-2023-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2023
OTHER-2023-031-Approval of a professional services contract with Clarion associates to develop a comprehensive land use plan and approval of budget amendment 9-A
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-032-Deed of Trust Supplement #1
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-033-First Supplemental Trust Agreement
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
PRO-2023-008-Proclamation recognizing the success and accomplishments of Orange County High School robotics teams
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2023
PRO-2023-009-EMS Week Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2023
RES-2023-038-Resolution honoring Chief deputy Jamison R Sykes for 28 years of law enforcement service and awaeding him his badge and sidearm
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-039-Adoption to the final resolution authorizing 2023 installment financing for various capital investment plan project for up to 14,500,000
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-040-Resolution in Support of Safe and Legal Reproductive Healthcare
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
33 <br /> Section II <br /> B. Student Membership Projection Methodology <br /> 1. Responsible Entity for Suggesting Change—This section is reviewed and <br /> recommended by the Planning Directors, School Representatives, and Technical <br /> Advisory Committee (SAPFOTAC)to the BOCC for change, if necessary. <br /> 2. Definition —The method(s)by which student memberships are calculated for future <br /> years to determine total membership at each combined school level (Elementary, <br /> Middle, and High School)which take into consideration historical membership totals <br /> at a specific time (November 15) in the school year. These methods are also known as <br /> 'models'. <br /> 3. Standard for: Standard for: <br /> Chapel Hill-Carrboro City School District Orange County School District <br /> Presently, the average of five models is being used: namely 3, 5, and 10-year history/cohort <br /> survival methods, Orange County Planning Department Linear Wave, and Tischler Linear <br /> methods. Attachment II.B.1 includes a description of each model. <br /> 4. Analysis of Existing Conditions: <br /> Performance of the models is monitored each year. The value of a projection model is <br /> in its prediction of school level capacities at least three years in advance of capacity <br /> shortfalls so the annual Capital Investment Plan(CIP)updates can respond <br /> proactively with siting, design, and construction. Attachment II.B.1 includes a <br /> description of each model. Attachment II.B.3 shows the performance of the models <br /> for the 2022-23 school year from the prior year projection. <br /> S. Recommendation: <br /> Analysis on the accuracy of the results is showing that some models have better <br /> results in one district while others have better results in the other district. The historic <br /> growth rate is recorded by the models, but projected future growth is more difficult to <br /> accurately quantify. In all areas of the county,proposed growth is not included in the <br /> SAPFO projection system until actual students begin enrollment. The system is <br /> updated in November of each year, becoming part of the historical projection base. <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.