Browse
Search
Agenda - 05-08-2002 - 8h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 05-08-2002
>
Agenda - 05-08-2002 - 8h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 4:19:35 PM
Creation date
8/29/2008 10:38:37 AM
Metadata
Fields
Template:
BOCC
Date
5/8/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8h
Document Relationships
Minutes - 20020508
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Annie Walton <br /> 165 Hayes St. <br /> HWSbmvugh <br /> 732-59W <br /> IIM9/Ol 3 <br /> 3. Install A inch sheevock on the walls,lemine 'a%inch gap henvrea to Floor and <br /> to sheetrock.Seal the gap with a silicone caulk.Tape and finish the Amerrock <br /> smooth <br /> 6. install colorml style baebourd. <br /> 5. Extend to daortamb and inalall colmdal style casing. <br /> 6. Remove the weather-snippi ngonmedean.Insect a strike flare for the lock <br /> 7. Prepare and clean au surfaces for palm.Paint the wane with semigloss laces paint, <br /> the ceiling with ceiling white latex paint and the trim and door with <br /> semiglossladex paint. Pent to cover completely. <br /> I.e rfl Bedroom: <br /> 1. Remove the ceiling and wall covering. <br /> _. Install Lx3 foxing stripe on did wall.Leave a Id inch gap between the floor and <br /> the domain of the mining strips. Seal to gap and all seams with a silicone caulk. <br /> Install V,inch stymfoom between to fr tang soma, Seal all scams. <br /> 3. install 5/8 inch shee o ck on the ceiling.Tape and finish the shcetrock smooth. <br /> 6. Install%inch sheerrrick on the walls.Leave a'A inch gap between die banom of <br /> the sheeVOck and floor.Fill the gap with silicone caulk.Tape and finish the <br /> slreetmck smuut. <br /> 5. Remove the floor covering in the eN/front bedeom. Clean the floor with an <br /> industrial cleaner so that ad din,and and dcbns me removed hom the joint whore <br /> Is slab meals the wall. Install two apphcariona of a concede, p ily etanes <br /> masonry crack sealer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.