Browse
Search
Agenda - 05-08-2002 - 8h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 05-08-2002
>
Agenda - 05-08-2002 - 8h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 4:19:35 PM
Creation date
8/29/2008 10:38:37 AM
Metadata
Fields
Template:
BOCC
Date
5/8/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8h
Document Relationships
Minutes - 20020508
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FAna E. Scurlock page 3 <br /> 1000 Lipscomb Grove Ch Rd, <br /> Hillsborough,NC 27278 <br /> 21M02 <br /> BEDROOM p3 <br /> 1. Skim the damaged tape joints on the walls and ceiling with shedrock <br /> Sher.Finish the exterior comer with ormireck filler. Send all new <br /> sbeonock filler,prime and paint.Paint the walls and ceiling with flat <br /> latex paint.Paint Ne trim,door and window,with semigloss latex. <br /> Paint to cover completely. <br /> BATHROOM: <br /> 1. Remove the toilet,tub and vmtity/sink Do not damage vanity/siNC. <br /> Remove the wall and ceiling covering to the surds and ceilingjuiats. <br /> 2. Repair any damaged subfloor or joists in the tub area. <br /> 3. Prepare the floor for vinyl.Install Y largo plywood over the sabfloon. <br /> hvsmll a new vinyl floor Vmyl to cost not less than S14/yd. Install <br /> metal /run at the door opening. <br /> 4, humpW'shcetrock on the walls and ceiling. Install MR shamrock <br /> aromd the Web/shower area.Finish the walls and ceiling smooth. <br /> 5. Prime and paint ceiling with ceiling white latex.Paint the walls <br /> with semigloss latex paint. _ <br /> G. Install new door and window casing. Install new Y baseboard <br /> and shoe molding. Prime and paint all trim with semigloss latex. <br /> Paint to cover completely. <br /> BATHROOM PLUMBING: <br /> I. Install a new handicap commode. Install anew supply line and cutoff. <br /> 2, Reused]the sink/vartily. Install anew p trap,supply line god cutoffs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.