Browse
Search
Agenda 05-16-2023; 8-e - Schools Adequate Public Facilities Ordinance – Approval and Certification of 2023 Report
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2023
>
Agenda - 05-16-2023 Business Meeting
>
Agenda 05-16-2023; 8-e - Schools Adequate Public Facilities Ordinance – Approval and Certification of 2023 Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2023 4:02:45 PM
Creation date
5/11/2023 3:53:23 PM
Metadata
Fields
Template:
BOCC
Date
5/16/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-e
Document Relationships
Agenda for May 16, 2023 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2023\Agenda - 05-16-2023 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> ORANGE COUNTY SCHOOL DISTRICT <br /> Elementary School Level <br /> A. Does not currently exceed 105%LOS standard(current LOS is 91%). <br /> B. The projected growth rate at this level is expected to increase over the next 10 years <br /> (average— 0.26% compared to -0.98% over the past 10 years). <br /> C. Similar to last year, projections are not showing a need for an additional Elementary <br /> School in the 10-year projection period. <br /> Middle School Level <br /> A. Does not currently exceed 107% LOS standard(current LOS is 73.8%). <br /> B. The projected growth rate at this level is expected to increase,but remain negative over <br /> the next 10 years (average— -0.15% compared to -0.25% over the past 10 years). <br /> C. Similar to last year, projections are not showing a need for an additional Middle School <br /> in the 10-year projection period. <br /> High School Level <br /> A. Does not currently exceed 110%LOS standard(current LOS is 84.6%). <br /> B. The projected growth rate at this level is expected to increase over the next 10 years <br /> (average— 0.98% compared to 0.83% over the past 10 years). <br /> C. Similar to last year, projections are not showing a need for additional High School in the <br /> 10-year projection period. <br /> ADDITIONAL INFORMATION <br /> Pre-K Students <br /> In recent years, Pre-K enrollment has been a topic of discussion with both school districts. At <br /> this time, SAPFO has not been amended to include Pre-K in the membership and capacity <br /> numbers. However, Pre-K numbers and impacts continue to be monitored by the SAPFOTAC. <br /> Pre-K students for each district is as follows: <br /> Chapel Hill-Carrboro <br /> City Schools Schools <br /> School Year Number of Students Number of Students <br /> 2019-20 267 144 <br /> 2020-21 208 86 <br /> 2021-22 222 125 <br /> 2022-23 295 101 <br /> Charter and Private Schools <br /> Currently, there are two Charter Schools located in the Town of Hillsborough. Charter student <br /> membership for these two schools is as follows: <br /> School Year Number of Students Number of Students <br /> 2017-18 542 326 <br /> 2018-19 655 (+113) 355 (+29) <br /> 2019-20 715 (+60) 365 (+10) <br /> 2020-21 747 (+32) <br /> 2021-22 751 (+4) 365* <br /> 2022-23 777 (+26) <br /> *The Expedition School reached full capacity of 365 students in 2019-20 <br /> 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.