Orange County NC Website
<br />12.Please select the jurisdic-on(s) <br />where your project is focused <br />and briefly state how your <br />project aligns with the relevant <br />Climate Ac-on Plans (2-4 <br />sentences). <br />Please name the ac-on items <br />from each relevant plan that <br />best align with your proposed <br />project: <br />☐ Carrboro: hsps://townofcarrboro.org/928/Community- <br />Climate-Ac-on-Plan <br />☐ Chapel Hill: hsps://www.sustainchapelhill.org/featured/ <br />2020/2/18/climate-ac-on-and-response-plan <br />☐ Orange County: In progress, please instead show alignment <br />with the Orange County BOCC Goals and Priori/es. <br />This proposed project aligns with the above plan(s) in the <br />following ways: <br />This project aligns with the Orange County BOCC Goal and <br />priority to preserve and protect natural environments that <br />include clean air, wildlife and sustainable energy, by reducing <br />waste in the landfill, crea-ng rich compost that will increase soil <br />health and produc-vity and capture more carbon, reducing <br />driving to farther waste collec-on sites, and reducing methane <br />emissions at the landfill. <br /> Page of 9 22 <br />DocuSign Envelope ID: 9FB641C3-C7F6-4609-BE4A-71829032AD83