Browse
Search
2023-201-E-Human Resources-Cotton Commercial USA Inc-To perform work
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-201-E-Human Resources-Cotton Commercial USA Inc-To perform work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2023 8:46:20 AM
Creation date
5/10/2023 8:45:58 AM
Metadata
Fields
Template:
Contract
Date
5/9/2023
Contract Starting Date
5/9/2023
Contract Ending Date
5/9/2023
Contract Document Type
Contract
Amount
$25,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit "A" 2023 Rate Schedule <br />I. Personnel Labor Rates: <br />The personnel labor classification("Classifications") and the classification hourly rates listed below ("Classification Hourly Rates") apply <br />to any and all personnel engaged to fulfill the terms of the Agreement, these personnel may include but are not limited to the full time employees <br />of Cotton Commercial USA, Inc. ("Cotton"), temporary hires employed directly by Cotton, any personnel secured through subcontracted <br />labor, or any personnel subcontracted by Cotton that falls into the labor categories below. Rates stated below are per person per hour. <br />A. Classification - Management Classification Hourly Rates Classification Hourly Rates <br />Project Consultant (PCS) $150.00 Project Accountant (PA) $83.50 <br />Project Coordinator (PC) $130.00 Assistant Project Manager (APM) $83.50 <br />Project Manager (PM) $100.00 Project Administrative (PAA) $55.00 <br />Health & Safety Officer (HSO) $95.00 <br />Classification - Restoration <br />Drying / Equipment Technician (DET) $65.00 Biohazard, Trauma, Forensic Supervisor (BTFS) $110.00 <br />Equipment Operator (EO) $78.00 Biohazard, Trauma, Forensic Technician (BTFT) $80.00 <br />Restoration Supervisor (RS) $67.50 Biohazard, Trauma, Forensic Labor (BTFL) $65.00 <br />Resource Coordinator (RC) $58.00 Certified Asbestos / Lead Supervisor (AS) $75.00 <br />Restoration Technician (RT) $55.00 Asbestos Technician / Worker (AT) $65.00 <br />General Labor (GLE) - (Experienced with Cotton Operations)$42.50 Mold Remediation Worker (MRW) $61.00 <br />General Labor (GL) $39.00 <br />Classification - Construction <br />Metal Worker / Fabricator (FAB) $160.00 Wallcovering Installer (WPR) $60.50 <br />Electrician (E) $145.00 Carpenter - Finish (FNH) $60.50 <br />HVAC Technician (HVC) $145.00 Masonry (MAS) $60.00 <br />Plumber (PLM) $145.00 Drywall (D) $58.00 <br />Fire Suppression (FS) $135.00 Painter (P) $58.00 <br />Welder (WLD) $98.50 Carpenter - Rough (FNC) $57.50 <br />Scaffolder (SCF) $95.00 Tile Installer (TIL) $56.50 <br />Estimator (EST) $85.00 Flooring Installer (FCI) $56.00 <br />Superintendent (SP) $79.50 Acoustic Tile Installer (ACT) $55.00 <br />Trade Supervisor (TS) $69.00 Insulation Technician (INS) $48.00 <br />Roofer (RFG) $65.00 <br />Management Fee (Management of Customer Labor Force) $4.50 per hour / man <br />B. Labor Considerations / Provisions: <br />1. All scheduled rates are per the first 40 hours worked in a week, based on a seven (7) day work week (Monday-Sunday). <br /> All hours worked in excess of 40 hours in a week will be billed at (1.5) times the normal rate schedule. Commencement of any new <br /> project Friday after 5:00PM is subject to 1.5 times normal rates. All hours will reset on Monday and subject to our normal hourly rates. <br />2. All holidays recognized by Cotton Commercial USA, Inc. (" Cotton ") will be billed at (2) times the normal billing rates. <br /> Recognized holidays are New Years, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving, Christmas Eve, <br /> and Christmas. If applicable federal state, or local law requires recognition of holidays other than those recognized by <br /> Cotton, those additional holidays will be billed at (2) times the normal billing rate. <br />3. Cotton response personnel who are placed on stand-by by the Customer, either on site or at an offsite location, who remain <br /> dedicated exclusively to the Customer, will be billed at full rates for a minimum of four (4) hours per day. Lodging and per diem rates <br /> will also be billed for all personnel placed on stand-by. <br />pg. 1 of 5 <br />Customer Initials:________ Cotton Initials:________ <br />Rev. 1 - Feb, 2023 <br />DocuSign Envelope ID: E737BD71-2898-4C23-ADC2-40E10C31F966
The URL can be used to link to this page
Your browser does not support the video tag.