Orange County NC Website
71 <br /> EDEN VIEW ACRES <br /> CERTIFICATE OF COMPLIANCE <br /> This form is to be completed and submitted to the ARB by the lot specific Builder/Owner and signifies an <br /> official request for the final ARB review and approval of construction and landscaping. Please submit this <br /> form a minimum of 14 days prior to final construction completion and/or prior to homeowner closing/ <br /> occupancy of house for ARB on site review and approval. The ARB review is to be expedited only on an as <br /> needed case by case basis. <br /> Builder/Owner Name Lot No. <br /> Street Address <br /> BUILDER/OWNER CERTIFICATION <br /> I have reviewed and verified that all construction,site work and landscaping is completed per the original reviewed/ <br /> approved ARB Submittal and as set forth in the Guidelines and hereby request the ARB site visit and final post <br /> construction certification. Attached to this application are any incomplete items for ARB reference at time of site <br /> inspection. It is our understanding that all such non-compliance issues(house as well as landscaping)found during the <br /> ARB on-site inspection review shall be communicated to the homeowner and it is the builder's and homeowner's total <br /> responsibility to complete such non-compliance issues as follows: Builder shall not close on the house/lot without first <br /> either,(1)Bringing all such issues into compliance as required prior to closing and obtaining approved Certificate of <br /> Compliance from the Developer/Owner/ARB,(2)disclosing any non-compliance items to the homeowner in writing <br /> specifying the time period for which such issues will be corrected and obtaining homeowner's signature acknowledging <br /> that such items are outstanding and agreeing to such time period for correction. (If builder elects this clause,the builder <br /> shall provide a signed copy of the homeowner's acknowledgement to Developer/Owner/ARB for approval prior to <br /> closing of such property and final Certificate of Compliance will be issued after completion of such issues/after closing <br /> of property.) <br /> Signature of Builder/Owner Date <br /> The ARB has visited the site,has completed the Final Construction Inspection Review and hereby certifies the <br /> building and site improvements(as noted)to be in compliance with the original reviewed/approved ARB Submittal <br /> and Guidelines with any review comments as noted on attached Post Construction Summary. <br /> The Certificate of Compliance is provided by the ARB for the purposes of documenting(1)aesthetic qualities, <br /> (2)compliance with the original ARB Submittal and(3)compliance with the Guidelines. The Builder/ <br /> Owner is fully responsible for compliance with all other Eden View Acres Covenants,applicable state and <br /> local building and zoning codes,regulations,ordinances,etc. <br /> ❑ Approved <br /> ❑ Approved as Noted/Re-Submit(See attached comments for completion and DRC review and approval <br /> prior to occupying/closing the property and receiving the final approved Certificate of Compliance.) <br /> Reviewed By Date <br /> EDEN VIEW ACRES ARB Representative <br /> ■ ■ ■ ■ ■ ■ ■ <br /> 28 <br />