Browse
Search
Agenda - 05-02-2023; 5-c - Zoning Atlas Amendment – 4801 and 4901 Dairyland Road (PINs 9841-52-7281 9840-79-5091), Hillsborough, Bingham Township
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 05-02-2023 Business Meeting
>
Agenda - 05-02-2023; 5-c - Zoning Atlas Amendment – 4801 and 4901 Dairyland Road (PINs 9841-52-7281 9840-79-5091), Hillsborough, Bingham Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 4:00:16 PM
Creation date
4/27/2023 4:03:36 PM
Metadata
Fields
Template:
BOCC
Date
5/2/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-c
Document Relationships
Agenda for May 2, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 05-02-2023 Business Meeting
Minutes-05-02-2023-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2023
ORD-2023-020-An Ordinance Amending the Orange County Zoning Atlas
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2023
OTHER-2023-025-Statement of Consistency
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-026-Approval of Memorandum of Agreement between the Orange County Board of Commissioners and North Carolina State University
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-028-Contract to audit accounts
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-029-Application for North Carolina education lottery proceeds for Chapel Hill Carrboro city schools and contingent approval of budget amendment 8-B related to CHCCS capital project ordinances
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-030-Application for North Carolina education lottery proceeds for Orange County Schools-OCS and contingent approval of budget amendent 8 -C-related to OCS capital project ordinances
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
PRO-2023-005-Older Americans Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2023
PRO-2023-006-Provider Appreciation Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2023
PRO-2023-007-Mental Health Awareness Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2023
RES-2023-032-Public Hearing on the Financing of Various Capital Investment Plan Projects
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-033-Public Hearing on Renaming Judah Benjamin Court to Aspen Court
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-034-RESOLUTION AUTHORIZING THE SUBMISSION OF THE FY 2023-2024 ANNUAL ACTION PLAN FOR ORANGE COUNTY, NORTH CAROLINA
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-035-Resolution authorizing the orange county FY 2023-2024 home program design
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-036-REFUND-RELEASE RESOLUTION
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-037-REFUND-RELEASE RESOLUTION
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
48 <br /> 11. ARB reviews will be completed within ten business days after the receipt and ARB Meetings/ <br /> reviews/approvals (pending current ARB and Developer/Owner activity schedules, <br /> holidays, etc.). Reviews/approvals shall be inserted in the ARB permanent files and <br /> distributed to the builders/homeowners, attendees, etc. via email and/or fax for builder <br /> coordination. If responses are required sooner than ten business days,please coordinate a <br /> personal ARB Meeting with the ARB Representative (as previously noted)and attend the <br /> ARB Meeting in person for immediate response and/or make such a request in writing. <br /> 12. Copies of the meeting summaries will be forwarded to the builder and/or homeowner and <br /> others only as requested. <br /> Architectural Review Board Procedures for <br /> Alterations and Additions — <br /> Homeowner ( Post—closing ) Section <br /> 1. After plans are approved for construction,the procedures of this section must be followed and <br /> completed for any alterations and additions. <br /> 2. The ARB Alterations and Additions Submittal Checklist(see Appendix)must be submitted to <br /> the ARB for review and approval of all exterior changes or additions to your residence or <br /> property prior to proceeding with permitting or construction. The list of changes, alterations <br /> or additions includes,but is not limited to the following and as noted in the Guidelines: Any <br /> addition to an existing dwelling(room additions, garages, etc.), exterior color revisions, <br /> fencing, landscaping projects(other than typical maintenance of original existing landscaping <br /> /beds and removal of dead trees/growth, etc.),hardscape projects(fish ponds, fountains,yard <br /> art, arbors,trellises, etc.), decks,porches, screened porches,patios, awnings,play equipment <br /> (other than typical mobile play equipment and toys not to remain outside of dwellings after <br /> specific use), dog houses,retaining walls, storage sheds,playhouses, satellite TV dishes, etc. <br /> 3. The Guidelines are in total effect concerning any alteration or addition. A copy of the <br /> Guidelines is available for reference through the ARB, Developer/Owner. <br /> 4. The Application submittal shall include the following as required to communicate the scope of <br /> the proposed new construction: <br /> • ARB Alterations and Additions Submittal Checklist, site plan(indicating the location of <br /> the proposed alteration or addition, existing building(s),property lines, setbacks, etc.) <br /> • Detailed construction drawings to scale (including a full view of the addition,with all <br /> exterior elevations, as it will look attached to the existing structure. A view of the entire <br /> structure is necessary to help determine balance.) <br /> • Drawings or photographs (as needed/showing the existing conditions before the proposed <br /> changes) <br /> • Samples of colors and materials (if different from existing building), landscape plan/ <br /> Landscape Submittal Checklist Form and plant schedule(if applicable or required) <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.