Orange County NC Website
47 <br /> requirements and approved plans and elevations, etc. may result in the required removal of <br /> any non-conforming construction, detailing, colors, etc. at the builder's/homeowner's <br /> expense The ARB and Developer/Owner reserves the right of entry to any property within <br /> the development for inspection purposes. <br /> 5. All ARB submittals,proposals, questions, etc. shall be submitted to the ARB/ARB <br /> Representative via email and/or in person to Keith T. Brown,KTB 1590@gmail.com and to <br /> schedule ARB reviews and appointments. ARB Reviews and Meeting appointments will be <br /> scheduled on an as needed basis and a first-come first-served basis and may be scheduled up <br /> until the ARB Meeting if time is available. Currently there is not a specific ARB Meeting <br /> schedule and as noted will be scheduled on an as needed basis. In the future a specific day <br /> and time for ARB Meetings may be scheduled as related to additional and consistent activity. <br /> 6. Submittals shall include the ARB Submittal Checklist(see Appendix), Site Plan,Landscape <br /> Submittal Checklist/Landscape Plan, Floor Plans, Elevations (front, sides and rear), color <br /> proposals/Color Selection Form and any alternate/special details (i.e. handrails, columns, <br /> etc.). The landscape Submittal Checklist/Landscape Plan shall be submitted to Keith T. <br /> Brown as noted on the Landscape Submittal Checklist form. The landscape plan required for <br /> each specific lot may be delayed and submitted to the ARB for review and approval at least 30 <br /> days prior to landscape installation. All submittals are preferred in PDF form via email,but <br /> may also be submitted via one-side only format on 8 1/2" x 11"paper. Concept drawings or <br /> preliminary plans may be submitted to the ARB for review, comment and preliminary <br /> approval before more detailed plans and the final submittal are completed and submitted. <br /> Submittals not meeting these requirements will be returned for completion prior to ARB <br /> review. <br /> 7. The ARB generally reviews submittals for aesthetic purposes only and shall have no <br /> responsibility or liability for reviews in any other areas including but not limited to local <br /> ordinance requirements, code/covenant requirements as noted earlier, sales/market <br /> relationships,price points related to market,builder contract responsibilities/minimum SF <br /> requirements, etc. <br /> 8. The ARB will review each proposal (as marked up on the original ARB Submittal package) <br /> and determine if the proposal is either"Approved", "Approved as noted", "Not approved"or <br /> "Re-submit". "Approved"and"Approved as noted" submittals may continue into permitting <br /> and construction with the understanding that all ARB comments and directives are to be <br /> completed. "Not approved"and"Re-submit"directives shall be re-submitted to the ARB for <br /> ARB review and approval prior to proceeding with permitting and construction. <br /> 9. After initial review and approval of submittal, final on-site flagging of the approved location <br /> of house, drives,walks, etc. is required for an on site ARB review and approval prior to <br /> beginning construction and site clearing. <br /> 10. Near the completion of construction, a final inspection shall be requested by the Builder/ <br /> Homeowner and completed by the ARB prior to final approval of the house. See Certificate <br /> of Compliance form in rear of Guidelines for additional reference. <br /> 4 <br />