Browse
Search
Agenda - 05-02-2023; 5-c - Zoning Atlas Amendment – 4801 and 4901 Dairyland Road (PINs 9841-52-7281 9840-79-5091), Hillsborough, Bingham Township
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 05-02-2023 Business Meeting
>
Agenda - 05-02-2023; 5-c - Zoning Atlas Amendment – 4801 and 4901 Dairyland Road (PINs 9841-52-7281 9840-79-5091), Hillsborough, Bingham Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 4:00:16 PM
Creation date
4/27/2023 4:03:36 PM
Metadata
Fields
Template:
BOCC
Date
5/2/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-c
Document Relationships
Agenda for May 2, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 05-02-2023 Business Meeting
Minutes-05-02-2023-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2023
ORD-2023-020-An Ordinance Amending the Orange County Zoning Atlas
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2023
OTHER-2023-025-Statement of Consistency
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-026-Approval of Memorandum of Agreement between the Orange County Board of Commissioners and North Carolina State University
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-028-Contract to audit accounts
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-029-Application for North Carolina education lottery proceeds for Chapel Hill Carrboro city schools and contingent approval of budget amendment 8-B related to CHCCS capital project ordinances
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-030-Application for North Carolina education lottery proceeds for Orange County Schools-OCS and contingent approval of budget amendent 8 -C-related to OCS capital project ordinances
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
PRO-2023-005-Older Americans Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2023
PRO-2023-006-Provider Appreciation Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2023
PRO-2023-007-Mental Health Awareness Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2023
RES-2023-032-Public Hearing on the Financing of Various Capital Investment Plan Projects
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-033-Public Hearing on Renaming Judah Benjamin Court to Aspen Court
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-034-RESOLUTION AUTHORIZING THE SUBMISSION OF THE FY 2023-2024 ANNUAL ACTION PLAN FOR ORANGE COUNTY, NORTH CAROLINA
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-035-Resolution authorizing the orange county FY 2023-2024 home program design
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-036-REFUND-RELEASE RESOLUTION
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-037-REFUND-RELEASE RESOLUTION
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
153 <br /> Erosion and Sedimentation Control: <br /> According to current Orange County GIS imagery of the project parcel, there are <br /> approximately six (6) mapped stream features or other water features (e.g. ponds and/or <br /> wetlands) within the project parcel boundaries. Grange County enforces stream buffers <br /> along streams, rivers, water bodies, and other water features (e.g. wetlands) as outlined <br /> in Section 6.13 of the Orange County UDO. Based on the submitted materials for the <br /> proposed development and anticipated limits of disturbance, the project could meet the <br /> basic Erosion and Sedimentation Control requirements as outlined in Section 6.15 of the <br /> Orange County UDO and could be developed as generally proposed. <br /> Stormwater Mana ement: <br /> The project parcel is located in the Cane Creek Protected Watershed Overlay District, <br /> and is therefore subject to compliance with the Jordan Lake Nutrient Management <br /> Strategy. There are no known Special Flood Hazard Areas (SFHAs) located on the <br /> project parcel. Based on the submitted materials for the proposed development, the <br /> project could meet the basic Stormwater Management requirements as outlined in <br /> Section 6.14 of the Orange County UDO. The project proposes the installation of one (1) <br /> permanent primary Stormwater Control Measure (SCM) to meet water quantity <br /> requirements (i.e. post-development stormwater runoff attenuation). The developer will <br /> be obligated to ensure post-development conditions with no net increase greater than <br /> 10% in peak flow leaving the project site from the pre-development conditions, consistent <br /> with 15A NCAC 02H.1002(44). The submitted Stormwater Narrative must be revised <br /> to provide supporting calculations as such. There are no water quality requirements <br /> (i.e. post-development nutrient attenuation) currently associated with the Watershed <br /> Overlay District within which the project site is located. The proposed primary SCM is <br /> currently identified as a. Dry Pond. The Site Plan, while preliminary at this stage of©range <br /> County review, meets applicable stormwater management requirements as outlined in <br /> Section 6.14 of the Orange County UDC} and is in general conformance with the North <br /> Carolina Stormwater Design Manual (i.e. Minimum Design Criteria). <br /> {Conclusion: <br /> The Division has No Objections to the approval of the rezoning request so long as a <br /> revised Stormwater Narrative and a complete LDP application and supporting pians and <br /> calculations are submitted to Orange County for review, processing and approval prior to <br /> commencement of on-site Land-Disturbing Activity. As the project progresses with <br /> engineering design, additional field observations, and/or permitting by others (e.g. US <br /> Army Corps of Engineers, NG Department of Environmental Quality, NC Department of <br /> Transportation, etc.), additional buffers, setbacks, and/or additional Orange County <br /> review and permitting may apply beyond the proposed development as shown with this <br /> rezoning request. <br /> C A lo/2.0 3 <br /> Christopher Sandt, PE Date <br /> 2:�� _�'/ <br /> Steve Kaltenbach Date <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.