Browse
Search
2023-167-E-AMS-Triangle Pond Managemen-Seymour Center hydrodynamic separtor
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-167-E-AMS-Triangle Pond Managemen-Seymour Center hydrodynamic separtor
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2023 3:41:02 PM
Creation date
4/24/2023 3:40:51 PM
Metadata
Fields
Template:
Contract
Date
4/21/2023
Contract Starting Date
4/21/2023
Contract Ending Date
4/24/2023
Contract Document Type
Contract
Amount
$14,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 04/23 1 <br />[Departmental Use Only] <br />TITLE Seymour Sump <br />FY 2022/2023 <br />NORTH CAROLINA <br />SERVICES AGREEMENT NO RFP/RFQ <br />ORANGE COUNTY <br /> This Services Agreement (hereinafter “Agreement”), made and entered into this 18th day of <br />April, 2023, (“Effective Date”) by and between Orange County, North Carolina a political <br />subdivision of the State of North Carolina (hereinafter, the "County") and Triangle Pond <br />Management LLC, (hereinafter, the "Provider"). <br />WITNESSETH: <br /> That the County and Provider, for the consideration herein named, do hereby agree as <br />follows: <br />1. Services <br />a.Scope of Work. <br />i)This Agreement is for services to be rendered by Provider to County with respect <br />to (insert type of project): Service Call - Hydrodynamic Separator: Remove <br />sediment from the storage sump & leaf debris & sedimnent from the fiberglass <br />insert of the hydrodynamic separator. Underground Detention: - Remove sediment <br />from all (3) 48" underground detention pipes. - Remove sediment from the manifold <br />collector box at end of pipes.- All material to be removed via Vac/Jetting Truck & <br />hauled offsite to an approved location.- Remove sediment at weir wall & clear the <br />obstructed 1" draw down orifice. Please see attached Proposal. <br />ii)By executing this Agreement, the Provider represents and agrees that Provider is <br />qualified to perform and fully capable of performing and providing the services <br />required or necessary under this Agreement in a fully competent, professional and <br />timely manner. <br />iii) Time is of the essence with respect to this Agreement. <br />iv)The services to be performed under this Agreement consist of Basic Services, as <br />described and designated in Section 3 hereof. Compensation to the Provider for <br />Basic Services under this Agreement shall be as set forth herein. <br />2.Responsibilities of the Provider <br />a.Services to be provided. The Provider shall provide the County with all services <br />required in Section 3 to satisfactorily complete the Project within the time limitations set <br />forth herein and in accordance with the highest professional standards. <br />b. Standard of Care. <br />DocuSign Envelope ID: 00C3793E-882D-4053-A45F-DD64B5013EED
The URL can be used to link to this page
Your browser does not support the video tag.